A NEW RANKING APPROACH AND ITS APPLICATION TO SOLVING FUZZY CRITICAL PATH PROBLEMS
نویسندگان
چکیده
منابع مشابه
A Compromise Ratio Ranking Method of Triangular Intuitionistic Fuzzy Numbers\ and Its Application to MADM Problems
Triangular intuitionistic fuzzy numbers (TIFNs) is a special case of intuitionistic fuzzy (IF) set and the ranking of TIFNs is an important problem. The aim of this paper is to develop a new methodology for ranking TIFNs by using multiattribute decision making methods (MADM). In this methodology, the value and ambiguity indices of TIFNs may be considered as the attributes and the TIFNs in compa...
متن کاملA NEW APPROACH FOR SOLVING FULLY FUZZY QUADRATIC PROGRAMMING PROBLEMS
Quadratic programming (QP) is an optimization problem wherein one minimizes (or maximizes) a quadratic function of a finite number of decision variable subject to a finite number of linear inequality and/ or equality constraints. In this paper, a quadratic programming problem (FFQP) is considered in which all cost coefficients, constraints coefficients, and right hand side are characterized by ...
متن کاملLinear programming approach for solving fuzzy critical path problems with fuzzy parameters
To the best of our knowledge, there is no method in the literature to find the fuzzy optimal solution of fully fuzzy critical path (FFCP) problems i.e., critical path problems in which all the parameters are represented by LR flat fuzzy numbers. In this paper, a new method is proposed for the same. Also, it is shown that it is better to use JMD representation of LR flat fuzzy numbers in the pro...
متن کاملA new approach to fuzzy quantities ordering based on distance method and its applications for solving fuzzy linear programming
Many ranking methods have been proposed so far. However, there is yet no method that can always give a satisfactory solution to every situation; some are counterintuitive, not discriminating; some use only the local information of fuzzy values; some produce different ranking for the same situation. For overcoming the above problems, we propose a new method for ranking fuzzy quantities based on ...
متن کاملA Ranking Approach for Intuitionistic Fuzzy Numbers and its Application
To the best of our knowledge very few methods have been proposed in previous studies for comparing intuitionistic fuzzy (IF) numbers. In this paper, the limitations and the shortcomings of all these existing methods are pointed out. In order to overcome these limitations and shortcomings a new ranking approach—by modifying an existing ranking approach—is proposed for comparing IF numbers. Thus,...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: The South African Journal of Industrial Engineering
سال: 2012
ISSN: 2224-7890
DOI: 10.7166/23-3-513