A new mathematical model for single machine batch scheduling problem for minimizing maximum lateness with deteriorating jobs
نویسندگان
چکیده
منابع مشابه
A new mathematical model for single machine batch scheduling problem for minimizing maximum lateness with deteriorating jobs
Article history: Received 10 March 2010 Received in revised form July, 25, 2011 Accepted 26 July 2011 Available online 27 July 2011 This paper presents a mathematical model for the problem of minimizing the maximum lateness on a single machine when the deteriorated jobs are delivered to each customer in various size batches. In reality, this issue may happen within a supply chain in which deliv...
متن کاملSingle Machine Scheduling Problem with Precedence Constraints and Deteriorating Jobs
This paper considers the single machine scheduling problem with precedence constraints and deteriorating jobs. A mathematical model based on binary integer programming (BIP) is developed. By these precedence constraints, jobs can not start before completion of its all predecessors. The represented model is in two steps, in step one the earliest starting time of each job is computed, then the re...
متن کاملGENETIC AND TABU SEARCH ALGORITHMS FOR THE SINGLE MACHINE SCHEDULING PROBLEM WITH SEQUENCE-DEPENDENT SET-UP TIMES AND DETERIORATING JOBS
This paper introduces the effects of job deterioration and sequence dependent set- up time in a single machine scheduling problem. The considered optimization criterion is the minimization of the makespan (Cmax). For this purpose, after formulating the mathematical model, genetic and tabu search algorithms were developed for the problem. Since population diversity is a very important issue in ...
متن کاملSingle Machine Scheduling Problem with Precedence Constraints and Deteriorating Jobs
This paper considers the single machine scheduling problem with precedence constraints and deteriorating jobs and a mathematical model based on binary integer programming (BIP) is developed. Since the precedence constraints exist, a job cannot start before completion of its all predecessors. The proposed model consists of two steps: in the first step, the earliest starting time of each job is c...
متن کاملA Mathematical Programming Model and Genetic Algorithm for a Multi-Product Single Machine Scheduling Problem with Rework Processes
In this paper, a multi-product single machine scheduling problem with the possibility of producing defected jobs, is considered. We concern rework in the scheduling environment and propose a mixed-integer programming (MIP) model for the problem. Based on the philosophy of just-in-time production, minimization of the sum of earliness and tardiness costs is taken into account as the objective fu...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: international journal of industrial engineering computations
سال: 2012
ISSN: 1923-2926,1923-2934
DOI: 10.5267/j.ijiec.2011.07.003