A new heuristic for open shop total completion time problem

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Hybrid Genetic Algorithm for the Open Shop Scheduling with Makespan and Total Completion Time

Proper scheduling of tasks leads to optimum using of time and resources, in order to obtaining best result. One of the most important and complicated scheduling problems is open shop scheduling problem. There are n jobs in open shop scheduling problem which should be processed by m machines. Purpose of scheduling open shop problem is attaining to a suitable order of processing jobs by specified...

متن کامل

A Hybrid Genetic Algorithm for the Open Shop Scheduling with Makespan and Total Completion Time

Proper scheduling of tasks leads to optimum using of time and resources, in order to obtaining best result. One of the most important and complicated scheduling problems is open shop scheduling problem. There are n jobs in open shop scheduling problem which should be processed by m machines. Purpose of scheduling open shop problem is attaining to a suitable order of processing jobs by specified...

متن کامل

A Two-Phase Constructive Heuristic for Permutation Flow-Shop Scheduling Problem Minimizing Total Completion Time

This paper describes a polynomial-time heuristic for the permutation flow-shop scheduling problem with the criterion of minimizing total completion time. The proposed method consists of two phases: arranging the jobs in priority order and then constructing a sequence. A new ranking method is employed to prioritize the jobs for incorporating into the construction phase of the heuristic. Computat...

متن کامل

a hybrid genetic algorithm for the open shop scheduling with makespan and total completion time

proper scheduling of tasks leads to optimum using of time and resources, inorder to obtaining best result. one of the most important and complicatedscheduling problems is open shop scheduling problem. there are n jobs in openshop scheduling problem which should be processed by m machines. purpose ofscheduling open shop problem is attaining to a suitable order of processing jobs byspecified mach...

متن کامل

A New Branch-and-Bound for the Problem of Mean Completion Time for the Single Machine with Release Time

Preemptively scheduling a set of independent jobs with release time on one processor is a historical problem. In this paper, the same problem has been considered in which objective is to minimize the mean flow time. To prepare a perfect branch-and-bound, some optimality conditions have been represented and they have been compared with the optimality conditions which have been proposed before. O...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Applied Mathematical Modelling

سال: 2010

ISSN: 0307-904X

DOI: 10.1016/j.apm.2009.06.014