A New Energy Power Grid Expansion Planning Technology Considering Optimal Economy
نویسندگان
چکیده
This paper examines the path of new energy development in China against backdrop carbon maximum and neutralization, studies risk large scale power transmission. In order to solve complex uncertainty challenges renewables grid expansion planning, this proposes an optimal economic planning model, which includes thermal generation start-up shutdown expenses during operation, hydro surplus water reservoir, curtail penalty cost output power, investment lines. The model has also considered constraints balance for load consumption, change rate, are calculated based on time-series operation simulation system. Based functions, process technology been proposed. proposed can consider characteristics generation, realize different schemes. According case study findings, transmission line relieve pressure local transmission, while improving flow distribution as well rate utilization.
منابع مشابه
Reliability-Based Grid Expansion Planning of Power Systems Considering Wind Turbine Generators
This paper describes a new methodology for grid expansion planning considering the probabilistic reliability of a composite power system including wind turbine generators (WTG). The proposed model includes capacity limitations and transmission line unavailability. The importance of renewable energy sources has been growing at a rapid rate due to environmental concerns. In particular, wind energ...
متن کاملDynamic Planning the Expansion of Electric Energy Distribution Systems Considering Distributed Generation Resources in the Presence of Power Demand Uncertainty
In this paper, a new strategy based on a dynamic (time-based) model is proposed for expansion planning of electrical energy distribution systems, taking into account distributed generation resources and advantage of the techno-economic approach. In addition to optimal placement and capacity, the proposed model is able to determine the timing of installation / reinforcement of expansion options....
متن کاملA MULTISTAGE EXPANSION PLANNING METHOD FOR OPTIMAL SUBSTATION PLACEMENT
Optimal distribution substation placement is one of the major components of optimal distribution system planning projects. In this paper optimal substation placement problem is solved using Imperialist Competitive Algorithm (ICA) as a new developed heuristic optimization algorithm. This procedure gives the optimal size, site and installation time of medium voltage substation, using their relate...
متن کاملDistribution Grid Planning Considering Smart Grid Technologies
Connection of distributed generation (DG) units, energy storages, and new loads into low voltage (LV) grids leads to a constrained operation of the grids. Consequently, voltage limits violation and overloading of grid assets occur more frequently. To tackle these issues, distribution system operators (DSO) still employ traditional techniques in planning distribution grids to increase grid hosti...
متن کاملA New Procedure for Reactive Power Market Clearing Considering Distributed Energy Resources
Traditionally, conventional generation unit was used to provide ancillary services e.g. reactive power support, and spinning reserve. Nonetheless, with the emergence of highly penetrated distributed energy resources (DERs) systems and considering how beneficial they can be; it appears reasonable to use them as reactive power providers. Therefore, this paper introduces a new procedure for DERs t...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Advances in transdisciplinary engineering
سال: 2022
ISSN: ['2352-751X', '2352-7528']
DOI: https://doi.org/10.3233/atde220260