A New Dominance Relation No-Wait Flowshop Scheduling Problems with Interval Setup Times

نویسندگان

چکیده

Minimizing the total completion time (TCT) is essential in numerous manufacturing settings. Since such a problem considered NP-hard, it not likely that an optimal solution exists. Accordingly, many papers scheduling literature look for dominance relation as to minimizing TCT. Furthermore, due wide range of unpredictability settings, consider settings with uncertain and bounded setup times. Nonetheless, most do take this uncertainty into account. In paper, we propose TCT times, which considerably better than best one literature. The percentage improvement comparing proposed paper over 1000 %. Hypothesis testing confidence intervals are also used further confirm effectiveness

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

َA Multi-objective simulated annealing algorithm to solving flexible no-wait flowshop scheduling problems with transportation times

This paper deals with a bi-objective hybrid no-wait flowshop scheduling problem minimizing the makespan and total weighted tardiness, in which we consider transportation times between stages. Obtaining an optimal solution for this type of complex, large-sized problem in reasonable computational time by using traditional approaches and optimization tools is extremely difficult. This paper presen...

متن کامل

Solving Group Scheduling Problem in No-wait Flow Shop with Sequence Dependent Setup Times

Different manufacturing enterprises use regularly scheduling algorithms in order to help meeting demands over time and reducing operational costs. Nowadays, for a better useofresources and manufacturingin accordance withcustomer needs and given the level ofcompetitionbetweencompanies, employing asuitablescheduling programhasa double importance. Conventional productionmethods are constantly subs...

متن کامل

Solving Group Scheduling Problem in No-wait Flow Shop with Sequence Dependent Setup Times

Different manufacturing enterprises use regularly scheduling algorithms in order to help meeting demands over time and reducing operational costs. Nowadays, for a better useofresources and manufacturingin accordance withcustomer needs and given the level ofcompetitionbetweencompanies, employing asuitablescheduling programhasa double importance. Conventional productionmethods are constantly subs...

متن کامل

َa multi-objective simulated annealing algorithm to solving flexible no-wait flowshop scheduling problems with transportation times

this paper deals with a bi-objective hybrid no-wait flowshop scheduling problem minimizing the makespan and total weighted tardiness, in which we consider transportation times between stages. obtaining an optimal solution for this type of complex, large-sized problem in reasonable computational time by using traditional approaches and optimization tools is extremely difficult. this paper presen...

متن کامل

A hybrid heuristic algorithm for the no-wait flowshop problem with sequence-dependent setup times

We consider the NP-hard no-wait flowshop scheduling problem with sequence-dependent setup times to minimize makespan. We propose a hybrid heuristic which combines the iterated greedy process with local search method based on a block swap operator. Experimental results show that the proposed heuristic is comparatively more effective than the existing metaheuristics.

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Advanced Research in Engineering Innovation

سال: 2023

ISSN: ['2682-8499']

DOI: https://doi.org/10.55057/ijarei.2022.4.4.5