A New Approach to Assessment of Infrastructure Projects on Urban Transport Systems

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

the impact of portfolio assessment on iranian efl students essay writing: a process-oriented approach

this study was conducted to investigate the impact of portfolio assessment as a process-oriented assessment mechanism on iranian efl students’ english writing and its subskills of focus, elaboration, organization, conventions, and vocabulary. out of ninety juniors majoring in english literature and translation at the university of isfahan, sixty one of them who were at the same level of writing...

15 صفحه اول

Inclusion of Health in Environmental Impact Assessment of Major Transport Infrastructure Projects in Vietnam

Background Infrastructure spending, especially in the transport sector, is expected to increase rapidly in Vietnam. This boost in transportation investment impacts health. Environmental impact assessments (EIAs) are essential tools for decision-making to reduce and mitigate anticipated impacts of development projects, and integration of health assessment as an essential part of the EIA process ...

متن کامل

Including Health in Environmental Assessments of Major Transport Infrastructure Projects: A Documentary Analysis

Background Transport policy and practice impacts health. Environmental Impact Assessments (EIAs) are regulated public policy mechanisms that can be used to consider the health impacts of major transport projects before they are approved. The way health is considered in these environmental assessments (EAs) is not well known. This research asked: How and to what extent was human health considere...

متن کامل

A Systems Approach to Information Technology (IT) Infrastructure Design for Utility Management Automation Systems

Almost all of electric utility companies are planning to improve their management automation system, in order to meet the changing requirements of new liberalized energy market and to benefit from the innovations in information and communication technology (ICT or IT). Architectural design of the utility management automation (UMA) systems for their IT-enabling requires proper selection of ...

متن کامل

a new approach to credibility premium for zero-inflated poisson models for panel data

هدف اصلی از این تحقیق به دست آوردن و مقایسه حق بیمه باورمندی در مدل های شمارشی گزارش نشده برای داده های طولی می باشد. در این تحقیق حق بیمه های پبش گویی بر اساس توابع ضرر مربع خطا و نمایی محاسبه شده و با هم مقایسه می شود. تمایل به گرفتن پاداش و جایزه یکی از دلایل مهم برای گزارش ندادن تصادفات می باشد و افراد برای استفاده از تخفیف اغلب از گزارش تصادفات با هزینه پائین خودداری می کنند، در این تحقیق ...

15 صفحه اول

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Transport and Telecommunication Journal

سال: 2012

ISSN: 1407-6179,1407-6160

DOI: 10.2478/v10244-012-0009-5