A New Algorithm for the Open-Pit Mine Production Scheduling Problem

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A genetic algorithm approach for open-pit mine production scheduling

In an Open-Pit Production Scheduling (OPPS) problem, the goal is to determine the mining sequence of an orebody as a block model. In this article, linear programing formulation is used to aim this goal. OPPS problem is known as an NP-hard problem, so an exact mathematical model cannot be applied to solve in the real state. Genetic Algorithm (GA) is a well-known member of evolutionary algorithms...

متن کامل

An imperialist competitive algorithm for solving the production scheduling problem in open pit mine

Production scheduling (planning) of an open-pit mine is the procedure during which the rock blocks are assigned to different production periods in a way that the highest net present value of the project achieved subject to operational constraints. The paper introduces a new and computationally less expensive meta-heuristic technique known as imperialist competitive algorithm (ICA) for long-term...

متن کامل

A new algorithm for the open-pit mine scheduling problem

For the purpose of production scheduling, open pit mines are discretized into threedimensional arrays known as block models. Production scheduling consists in deciding which blocks should be extracted, when they should be extracted and how each extracted block should be processed. Blocks which are on top should be extracted first, and capacity constraints limit the production each time period. ...

متن کامل

A New Algorithm for the Open-Pit Mine Production Scheduling Problem

For the purpose of production scheduling, open-pit mines are discretized into three-dimensional arrays known as block models. Production scheduling consists of deciding which blocks should be extracted, when they should be extracted, and what to do with the blocks once they are extracted. Blocks that are close to the surface should be extracted first, and capacity constraints limit the producti...

متن کامل

A variable neighbourhood descent algorithm for the open-pit mine production scheduling problem with metal uncertainty

Uncertainty is an inherent aspect of the open-pit mine production scheduling problem (MPSP); however, little is reported in the literature about solution methods for the stochastic versions of the problem. In this paper, two variants of a variable neighbourhood descent algorithm are proposed for solving the MPSP with metal uncertainty. The proposed methods are tested and compared on actual larg...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Operations Research

سال: 2012

ISSN: 0030-364X,1526-5463

DOI: 10.1287/opre.1120.1050