An algorithm for multi-objective job shop scheduling problem
Scheduling for job shop is very important in both fields of production management and combinatorial op-timization. However, it is quite difficult to achieve an optimal solution to this problem with traditional opti-mization approaches owing to the high computational complexity. The combination of several optimization criteria induces additional complexity and new problems. In this paper, we pro...
متن کاملMulti-objective Differential Evolution for the Flow shop Scheduling Problem with a Modified Learning Effect
This paper proposes an effective multi-objective differential evolution algorithm (MDES) to solve a permutation flow shop scheduling problem (PFSSP) with modified Dejong's learning effect. The proposed algorithm combines the basic differential evolution (DE) with local search and borrows the selection operator from NSGA-II to improve the general performance. First the problem is encoded with a...
متن کاملan algorithm for multi-objective job shop scheduling problem
scheduling for job shop is very important in both fields of production management and combinatorial op-timization. however, it is quite difficult to achieve an optimal solution to this problem with traditional opti-mization approaches owing to the high computational complexity. the combination of several optimization criteria induces additional complexity and new problems. in this paper, we pro...
متن کاملA multi-objective genetic algorithm (MOGA) for hybrid flow shop scheduling problem with assembly operation
Scheduling for a two-stage production system is one of the most common problems in production management. In this production system, a number of products are produced and each product is assembled from a set of parts. The parts are produced in the first stage that is a fabrication stage and then they are assembled in the second stage that usually is an assembly stage. In this article, the first...
متن کاملMulti-start simulated annealing for dynamic plant layout problem
In today’s dynamic market, organizations must be adaptive to market fluctuations. In addition, studies show that material-handling cost makes up between 20 and 50 percent of the total operating cost. Therefore, this paper considers the problem of arranging and rearranging, when there are changes in product mix and demand, manufacturing facilities such that the sum of material handling and rearr...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IFAC-PapersOnLine
سال: 2018
ISSN: 2405-8963
DOI: 10.1016/j.ifacol.2018.08.353