A Multi-Stage Stochastic Programming Model for the Multi-Echelon Multi-Period Reverse Logistics Problem

نویسندگان

چکیده

Reverse logistics planning plays a crucial role in supply chain management. Stochasticity different parameters along with time horizon can be challenge solving reverse problems. This paper proposes multi-stage, multi-period lot sizing decisions under uncertainties. The main uncertain factors are return and demand quantities, quality. Moment matching method was adopted to generate discrete set of scenarios represent the original continuous distribution stochastic parameters. Fast forward selection algorithm employed select most representative facilitate computational tractability. A case study conducted optimal solution recursive problem obtained by extensive form. Sensitivity analysis implemented on elements solution. Results sow that (RP) outperforms from expected values (EEV).

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Three-Echelon Multi-Objective Multi-Period Multi-Product Supply Chain Network Design Problem: A Goal Programming Approach

In this paper, a multi-objective multi-period multi-product supply chain network design problem is introduced. This problem is modeled using a multi-objective mixed integer mathematical programming. The objectives are maximizing the total profit of logistics, maximizing service level, and minimizing inconsistency of operations. Several sets of constraints are considered to handle the real situa...

متن کامل

A mixed integer linear programming formulation for a multi-stage, multi-Product, multi-vehicle aggregate production-distribution planning problem

In today’s competitive market place, companies seek an efficient structure of supply chain so as to provide customers with highest value and achieve competitive advantage. This requires a broader perspective than just the borders of an individual company during a supply chain. This paper investigates an aggregate production planning problem integrated with distribution issues in a supply chain ...

متن کامل

A multi-stage stochastic programming for condition-based maintenance with proportional hazards model

Condition-Based Maintenance (CBM) optimization using Proportional Hazards Model (PHM) is a kind of maintenance optimization problem in which inspections of a system relevant to its failure rate depending on the age and value of covariates are performed in time intervals. The general approach for constructing a CBM based on PHM for a system is to minimize a long run average cost per unit of time...

متن کامل

Building a Multi-Objective Model for Multi-Product Multi-Period Production Planning with Controllable Processing Times: A Real Case Problem

Model building is a fragile and complex process especially in the context of real cases. Each real case problem has its own characteristics with new concepts and conditions. A correct model should have some essential characteristics such as: being compatible with real conditions, being of sufficient accuracy, being logically traceable and etc. This paper discusses how to build an efficient mode...

متن کامل

Multi Product Multi Period Network Design For Reverse Logistics

Waste management in health institutions has become important in recent years because of the increase in population and industrialization. Waste generated from health institutions has risks for human health and the environment. Therefore, this paper presents a reverse logistics optimization for waste collection and disposal in Turkish health institutions. A multiperiod, multitype product waste r...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Sustainability

سال: 2021

ISSN: ['2071-1050']

DOI: https://doi.org/10.3390/su132413596