A multi-item batch fabrication problem featuring delayed product differentiation, outsourcing, and quality assurance

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Cost Minimization for a Multi-Product Fabrication-Distribution Problem with Commonality, Postponement, and Quality Assurance

To gain more competitive advantages and attract more customers from the turbulent business environment, manufacturing firms today must offer a wide variety of products to marketplaces. The existence of component commonality in multi-product fabrication planning enables managers to reevaluate different production design alternatives to lower overall production relevant costs. Motivated by assist...

متن کامل

Multi-product newsboy problem with limited capacity and outsourcing

This paper considers a multi-product newsboy system that produces multiple products for fulfilling independently uncertain demands, which share the same production capacity. To deal with possible shortage of limited capacity, productions can be outsourced. We consider two outsourcing strategies: zero lead time outsourcing, and nonzero lead time outsourcing. The structural properties and solutio...

متن کامل

Delayed multiattribute product differentiation

We develop a two-stage model for versioning products with respect to both vertical and horizontal attributes. At first, a firm positions its top-quality “flagship” product in a market with an imperfectly known distribution of tastes and reservation prices. In the second stage, the firm learns these consumer characteristics and has the option of extending its product line by versioning the flags...

متن کامل

Three Metaheuristic Algorithms for Solving the Multi-item Capacitated Lot-sizing Problem with Product Returns and Remanufacturing

This paper proposes a new mixed integer programming model for multi-item capacitated lot-sizing problem with setup times, safety stock and demand shortages in closed-loop supply chains. The returned products from customers can either be disposed or be remanufactured to be sold as new ones again. Due to the complexity of problem, three meta-heuristics algorithms named simulated annealing (SA) al...

متن کامل

Outsourcing, Product Quality, and Contract Enforcement

Does outsourcing compromise product quality? Does sound contract enforcement alleviate this concern? We offer a simple model to illustrate how outsourcing leads to lower product quality and how contract enforcement helps mitigate this problem. These theoretical predictions are borne out of a survey of 2,400 firms in China conducted by the World Bank in 2003.

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Industrial Engineering Computations

سال: 2021

ISSN: 1923-2926,1923-2934

DOI: 10.5267/j.ijiec.2020.9.003