A mixed integer programming model for forest harvest scheduling problem
نویسندگان
چکیده
منابع مشابه
A New Mixed-Integer Programming Model for Harvest Scheduling Subject to Maximum Area Restrictions
Forest ecosystem management often requires spatially explicit planning because the spatial arrangement of harvests has become a critical economic and environmental concern. Recent research on exact methods has addressed both the design and the solution of forest management problems with constraints on the clearcut size, but where simultaneously harvesting two adjacent stands in the same period ...
متن کاملA fuzzy mixed-integer goal programming model for a parallel machine scheduling problem with sequence-dependent setup times and release dates
This paper presents a new mixed-integer goal programming (MIGP) model for a parallel machine scheduling problem with sequence-dependent setup times and release dates. Two objectives are considered in the model to minimize the total weighted flow time and the total weighted tardiness simultaneously. Due to the com-plexity of the above model and uncertainty involved in real-world scheduling probl...
متن کاملA Mixed Integer Programming Formulation for the Heterogeneous Fixed Fleet Open Vehicle Routing Problem
The heterogeneous fixed fleet open vehicle routing problem (HFFOVRP) is one of the most significant extension problems of the open vehicle routing problem (OVRP). The HFFOVRP is the problem of designing collection routes to a number of predefined nodes by a fixed fleet number of vehicles with various capacities and related costs. In this problem, the vehicle doesn’t return to the depot after se...
متن کاملA Fuzzy Mixed-Integer Goal Programming Model for a Parallel Machine Scheduling Problem
This paper presents a new mixed-integer goal programming (MIGP) model for a parallel machine scheduling problem with sequence-dependent setup times and release dates under the hypothesis of fuzzy processing time’s knowledge. Two objectives are considered in the model to minimize the total weighted flow time and the total weighted tardiness simultaneously. At the end, the effectiveness of the pr...
متن کاملA reduced integer programming model for the ferry scheduling problem
We present an integer programming model for the ferry scheduling problem, improving existing models in various ways. In particular, our model has reduced size in terms of the number of variables and constraints compared to existing models by a factor of approximately O(n), where n being the number of ports. The model also handles efficiently load/unload time constraints, crew scheduling and pas...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Physics: Conference Series
سال: 2019
ISSN: 1742-6588,1742-6596
DOI: 10.1088/1742-6596/1175/1/012044