A Mixed Asymmetric Laplace Moving Average Process

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Modeling process asymmetries with Laplace moving average

Many records in environmental science exhibit asymmetries: for example in shallow water and with variable bathymetry, the sea wave time series shows front–back asymmetries and different shapes for crests and troughs. In such situation, numerical models are available but their computational cost and complexity are high. A stochastic process aimed at modeling such asymmetries has recently been pr...

متن کامل

Asymmetric Univariate and Bivariate Laplace and Generalized Laplace Distributions

Alternative specifications of univariate asymmetric Laplace models are described and investigated. A more general mixture model is then introduced. Bivariate extensions of these models are discussed in some detail, with particular emphasis on associated parameter estimation strategies. Multivariate versions of the models are briefly introduced.

متن کامل

Mixed Cumulative Sum-Exponentially Weighted Moving Average Control Charts: An Efficient Way of Monitoring Process Location

Shewhart, exponentially weighted moving average (EWMA), and cumulative sum (CUSUM) charts are famous statistical tools, to handle special causes and to bring the process back in statistical control. Shewhart charts are useful to detect large shifts, whereas EWMA and CUSUM are more sensitive for small to moderate shifts. In this study, we propose a new control chart, named mixed CUSUM-EWMA chart...

متن کامل

Mixed Exponentially Weighted Moving Average-Cumulative Sum Charts for Process Monitoring

The control chart is a very popular tool of statistical process control. It is used to determine the existence of special cause variation to remove it so that the process may be brought in statistical control. Shewhart-type control charts are sensitive for large disturbances in the process, whereas cumulative sum (CUSUM)–type and exponentially weighted moving average (EWMA)–type control charts ...

متن کامل

A Moving Average Exponential Point Process ( Ema 1 )

A construction is given for a stationary sequence of random variables {X.} which have exponential marginal distributions and are random linear combinations of order one of an i.i.d. exponential sequence {e.}. The Joint and trivariate exponential distributions of X.,, X. and X... are studied, as well as the Intensity function, point spectrum and variance time curve for the point process which ha...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Global Journal of Pure and Applied Mathematics

سال: 2017

ISSN: 0973-9750,0973-1768

DOI: 10.37622/gjpam/13.9.2017.6919-6928