A methodology for predicting company failure in the construction industry
نویسندگان
چکیده
منابع مشابه
the test for adverse selection in life insurance market: the case of mellat insurance company
انتخاب نامساعد یکی از مشکلات اساسی در صنعت بیمه است. که ابتدا در سال 1960، توسط روتشیلد واستیگلیتز مورد بحث ومطالعه قرار گرفت ازآن موقع تاکنون بسیاری از پژوهشگران مدل های مختلفی را برای تجزیه و تحلیل تقاضا برای صنعت بیمه عمر که تماما ناشی از عدم قطعیت در این صنعت میباشد انجام داده اند .وهدف از آن پیدا کردن شرایطی است که تحت آن شرایط انتخاب یا کنار گذاشتن یک بیمه گزار به نفع و یا زیان شرکت بیمه ...
15 صفحه اولmesuring the staff technology readiness, the case of a multi national chemical company operating in iran
چکیده ندارد.
15 صفحه اولCritical Factors to Company Success in the Construction Industry
Achieving success is a highly critical issue for the companies to survive in a competitive business environment. The construction industry is also an area where there is strong competition due to a large number of construction contractors. There have been many factors such as qualified employees, quality workmanship and financial management that can lead to company success in the construction i...
متن کاملDesigning a model for the transfer of entrepreneurial technologies in construction businesses in Oil Industry
The purpose of this study is to design a model for the transfer of entrepreneurial technologies in construction businesses in the oil industry. This research is a kind of exploratory mixed research that in the first step using the data foundation method and focusing on in-depth and semi-structured interviews with 18 experts, the conceptual model of the research was presented. In the second step...
متن کاملTime Prediction Using a Neuro-Fuzzy Model for Projects in the Construction Industry
This paper presents a prediction model based on a new neuro-fuzzy algorithm for estimating time in construction projects. The output of the proposed prediction model, which is employed based on a locally linear neuro-fuzzy (LLNF) model, is useful for assessing a project status at different time horizons. Being trained by a locally linear model tree (LOLIMOT) learning algorithm, the model is int...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Construction Management and Economics
سال: 1995
ISSN: 0144-6193,1466-433X
DOI: 10.1080/01446199500000023