A METHOD OF IMMEDIATE SETTLEMENT ANALYSIS OF PILED RAFT FOUNDATION BASED ON LOAD TRANSFER METHOD

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Effect of Ground Subsidence on Load Sharing and Settlement of Raft and Piled Raft Foundations

In this paper, two centrifugal model tests (case 1: raft foundation, case 2: 2x2 piled raft foundation) were conducted in order to evaluate the effect of ground subsidence on load sharing among piles and raft and settlement of raft and piled raft foundations. For each case, two conditions consisting of undrained (without groundwater pumping) and drained (with groundwater pumping) conditions wer...

متن کامل

Geotechnical Interaction of Piled Raft Foundations: Two Case Studies

Application of pile-raft foundations, which are known as “compound foundations”, is a suitable alternative in the case of heavy load structures. The interaction behavior of pile raft foundations makes these systems very complex to analyze. Different methods have been proposed to determine the bearing capacity of piled raft systems and distribution of loads between the components, i.e. pile grou...

متن کامل

Geotechnical Interaction of Piled Raft Foundations: Two Case Studies

Application of pile-raft foundations, which are known as “compound foundations”, is a suitable alternative in the case of heavy load structures. The interaction behavior of pile raft foundations makes these systems very complex to analyze. Different methods have been proposed to determine the bearing capacity of piled raft systems and distribution of loads between the components, i.e. pile grou...

متن کامل

Analysis of non-connected piled raft foundations (NCPRF) with cushion by finite element method

For the optimum design of Piled Raft Foundations (PRF), the concept of settlement reducer piles has been applied. However, when these piles are connected to the raft, a high stress may develop in the relatively small number of piles. Therefore, an alternative approach is to disconnect the piles from the raft forming a new system called a non-connected or disconnected piled-raft foundation (NCPR...

متن کامل

Evaluation of Piled Raft Behavior based on the Taguchi Method subjected to Combination of Vertical and Horizontal Loads

The results of an ongoing FEM parametric study are presented regarding the dependence of the resulting piled raft behavior under lateral load and combination of loads on pile diameter, pile length, arrangement of piles and raft thickness. Taguchi method with Analysis of Variance (ANOVA) was employed to calculate the contribution ratio of these factors on the lateral displacement of piled raft. ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Structural and Construction Engineering (Transactions of AIJ)

سال: 2002

ISSN: 1340-4202,1881-8153

DOI: 10.3130/aijs.67.111_2