A matrix-based flexible project-planning library and indicators
نویسندگان
چکیده
منابع مشابه
Matrix-based Project Planning Methods
Network planning methods for project planning and scheduling have been applied for more than fifty years including CPM, PDM, PERT and GERT (Fondahl, �96�; Fulkerson, �96�; Kelley & Walker, �959; PMI, ���6; Pritsker, �966), which can be widely applied to project planning fromareas as diverse as construction and R&D. However, these network planning methods are not very appropriate in cases where ...
متن کاملlearner autonomy in a computer-assisted project-based efl reading classroom
آموزش برمبنای ذخیره اطلاعات ، دانشجویان را به عنوان افرادی غیر متفکر وغیرقابل کنترل می پندارد . در همین راستا ، خواندن در سیستم آموزشی برمبنای ذخیره اطلاعات ، مهارتی پنداشته می شود که می توان آن را با یاد گرفتن انفعالی وجداگانه تعدادی از مهارتهای جزیی فراگرفت . درآن سو خواندن در سیستم آموزشی برمبنای طرح مسآله ،به عنوان رفتاری نقادانه تلقی می شود که از طریق آن می توان دنیای فرای کلمات را کشف کرد...
Based Project Planning Approach
This paper documents )1( the early phases of using systems Engineering to develop a conceptual system – the system being developed is a systems engineering body of knowledge )SEBoK( and )2( the findings and opportunities generated in those early phases. The approach was based on identifying activities specific to systems engineering, as opposed to the broad raft of activities that systems engin...
متن کاملKnowledge-Based Project Planning
Project management is a business process for successfully delivering one-of-a kind products and services under real-world time and resource constraints. Developing a project plan, a crucial element of project management, is a difficult task that requires significant experience and expertise. Interestingly, artificial intelligence researchers have developed both mixed-initiative and automated hi...
متن کاملPeriodic flexible maintenance planning in a single-machine production environment
Preventive maintenance is the essential part of many maintenance plans. From the production point of view, the flexibility of the maintenance intervals enhances the manufacturing efficiency. On the contrary, the maintenance departments tend to know the timing of the long term maintenance plans as certain as possible. In a single-machine production environment, this paper proposes a simulation–o...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Expert Systems With Applications
سال: 2023
ISSN: ['1873-6793', '0957-4174']
DOI: https://doi.org/10.1016/j.eswa.2022.119472