A matheuristic approach for the two-machine total completion time flow shop problem

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A matheuristic approach for the two-machine total completion time flow shop problem

This paper deals with the two-machine total completion time flow shop problem. We present a so-called matheuristic post processing procedure that improves the objective function value with respect to the solutions provided by state of the art procedures. The proposed procedure is based on the positional completion times integer programming formulation of the problem with O(n2) variables and O(n...

متن کامل

Investigation of the two-machine flow shop scheduling problem to minimize total energy costs with time-dependent energy prices

In this paper, the problem of two-machine flow shop scheduling to minimize total energy costs under time-of-use tariffs is investigated. As the objective function of this study is not a regular measure, allowing intentional idle-time can be advantageous. So this study considers two approaches, one for non-delay version of the problem and the other one for a situation when inserting intentional ...

متن کامل

Lower bounds for minimizing total completion time in a two-machine flow shop

For the NP-hard problem of scheduling n jobs in a two-machine flow shop so as to minimize the total completion time, we present two equivalent lower bounds that are computable in polynomial time. We formulate the problem by the use of positional completion time variables, which results in two integer linear programming formulations with O(n2) variables and O(n) constraints. Solving the linear p...

متن کامل

A Two-Phase Constructive Heuristic for Permutation Flow-Shop Scheduling Problem Minimizing Total Completion Time

This paper describes a polynomial-time heuristic for the permutation flow-shop scheduling problem with the criterion of minimizing total completion time. The proposed method consists of two phases: arranging the jobs in priority order and then constructing a sequence. A new ranking method is employed to prioritize the jobs for incorporating into the construction phase of the heuristic. Computat...

متن کامل

Total completion time minimization in two-machine flow shop scheduling problems with a fixed job sequence

This paper addresses scheduling n jobs in a two-machine flow shop to minimize the total completion time, subject to the condition that the jobs are processed in the same given sequence on both machines. A new concept of optimal schedule block is introduced, and polynomial time dynamic programming algorithms employing this concept are derived for two specific problems. In the first problem, the ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Annals of Operations Research

سال: 2011

ISSN: 0254-5330,1572-9338

DOI: 10.1007/s10479-011-0928-x