A Mathematical Programming Formulation for Cost-oriented Multi-manned Assembly Line Balancing Problem

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A cost-oriented model for multi-manned assembly line balancing problem

In many real world assembly line systems which the work-piece is of large size more than one worker work on the same work-piece in each station. This type of assembly line is called multi-manned assembly line (MAL). In the classical multi-manned assembly line balancing problem (MALBP) the objective is to minimize the manpower needed to manufacture one product unit. Apart from the manpower, othe...

متن کامل

a cost-oriented model for multi-manned assembly line balancing problem

in many real world assembly line systems which the work-piece is of large size more than one worker work on the same work-piece in each station. this type of assembly line is called multi-manned assembly line (mal). in the classical multi-manned assembly line balancing problem (malbp) the objective is to minimize the manpower needed to manufacture one product unit. apart from the manpower, othe...

متن کامل

Fuzzy multi-objective assembly line balancing problem: Fuzzy mathematical programming approach

Design of assembly line is done in order to more coordinate a collection of some consecutive work stations for the aim of obtaining more productivity from the work stations and workers. The stations are arranged in a way to have a continuous and constant material flow. In this paper a multi-objective formulation for assembly line balancing is introduced. As a solution approach a two-step approa...

متن کامل

Assembly line balancing problem with skilled and unskilled workers: The advantages of considering multi-manned workstations

This paper address a special class of generalized assembly line balancing in which it is assumed that there are two groups of workers: skilled and unskilled ones. The skilled workers are hired permanently while the unskilled ones can be hired temporarily in order to meet the seasonal demands. It is also assumed that more than one worker may be assigned to each workstation. To show the adv...

متن کامل

cost-oriented assembly line balancing with resource constraint

in this paper, based on the background of cost-oriented assembly line balancing problems, a novel mathematical model for scheduling and balancing the assembly line is offered that with the combination of task sequence-dependent setup time, parallel stations and resource constraint, minimizes the operational and investment costs of assembly system. due to the complexity of the problem, the equat...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IFAC-PapersOnLine

سال: 2015

ISSN: 2405-8963

DOI: 10.1016/j.ifacol.2015.06.429