A Market Power Test for Noncommercial Boycotts
نویسندگان
چکیده
منابع مشابه
A New Model Considering Uncertainties for Power Market
Medium-term modeling of electricity market has essential role in generation expansion planning. On the other hand, uncertainties strongly affect modeling and consequently, strategic analysis of generation firms in the medium term. Therefore, models considering these uncertainties are highly required. Among uncertain variables considered in the medium term generation planning, demand and hyd...
متن کاملthe test for adverse selection in life insurance market: the case of mellat insurance company
انتخاب نامساعد یکی از مشکلات اساسی در صنعت بیمه است. که ابتدا در سال 1960، توسط روتشیلد واستیگلیتز مورد بحث ومطالعه قرار گرفت ازآن موقع تاکنون بسیاری از پژوهشگران مدل های مختلفی را برای تجزیه و تحلیل تقاضا برای صنعت بیمه عمر که تماما ناشی از عدم قطعیت در این صنعت میباشد انجام داده اند .وهدف از آن پیدا کردن شرایطی است که تحت آن شرایط انتخاب یا کنار گذاشتن یک بیمه گزار به نفع و یا زیان شرکت بیمه ...
15 صفحه اولDesigning a specific upper body anaerobic power test for wrestling
Abstract The aim of this study was designing a specific upper body anaerobic power test for wrestlers and determining validity, reliability and objectivity of the designed test. In order to assess the anaerobic power of wrestlers on the basis of upper body Wingate test, Twenty two wrestlers (age=23/40±3/20 year, height=173/13±6/97 cm, weight=74/55±3/88 kg) of Tehran wrestling team (most of the...
متن کاملA New Framework for Reactive Power Market Considering Power System Security
This paper presents a new framework for the day-ahead reactive power market based on the uniform auction price. Voltage stability and security have been considered in the proposed framework. Total Payment Function (TPF) is suggested as the objective function of the Optimal Power Flow (OPF) used to clear the reactive power market. Overload, voltage drop and voltage stability margin (VSM) are inc...
متن کاملa new framework for capacity market in restructured power systems
in order to improve the reliability of the power system, sufficient amount of new capacity should be installed in the network. usually generation units’ payoff in an energy market is not adequate to cover their expenses. therefore, energy only market cannot induce investors to invest in generation field. due to energy only market inefficiency, a supplementary algorithm is suggested to cover the...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: The Yale Law Journal
سال: 1984
ISSN: 0044-0094
DOI: 10.2307/796172