A machine learning model for predicting multi-stage horizontal well production
نویسندگان
چکیده
منابع مشابه
Performance Model for Vertical Wells with Multi-stage Horizontal Hydraulic Fractures in Water Flooded Multilayer Reservoirs
For the characteristics of horizontal fractures in shallow low-permeability oil layers after hydraulic fracturing in multilayer reservoirs, horizontal fractures are taken equivalent to an elliptical cylinder with the reservoir thickness using the equivalent permeability model; then, upon the elliptic seepage theory, the seepage field which has led by a vertical well with horizontal fractures is...
متن کاملA data-driven workflow for predicting horizontal well production using vertical well logs
In recent work, data-driven sweet spotting technique for shale plays previously explored with vertical wells has been proposed. Here, we extend this technique to multiple formations and formalize a general data-driven workflow to facilitate feature extraction from vertical well logs and predictive modeling of horizontal well production. We also develop an experimental framework that facilitates...
متن کاملperformance model for vertical wells with multi-stage horizontal hydraulic fractures in water flooded multilayer reservoirs
for the characteristics of horizontal fractures in shallow low-permeability oil layers after hydraulic fracturing in multilayer reservoirs, horizontal fractures are taken equivalent to an elliptical cylinder with the reservoir thickness using the equivalent permeability model; then, upon the elliptic seepage theory, the seepage field which has led by a vertical well with horizontal fractures is...
متن کاملA mixed integer linear programming formulation for a multi-stage, multi-Product, multi-vehicle aggregate production-distribution planning problem
In today’s competitive market place, companies seek an efficient structure of supply chain so as to provide customers with highest value and achieve competitive advantage. This requires a broader perspective than just the borders of an individual company during a supply chain. This paper investigates an aggregate production planning problem integrated with distribution issues in a supply chain ...
متن کاملA multi-objective mathematical model for production-distribution scheduling problem
With increasing competition in the business world and the emergence and development of new technologies, many companies have turned to integrated production and distribution for timely production and delivery at the lowest cost of production and distribution and with the least delay in delivery. By increasing human population and the increase in greenhouse gas emissions and industrial waste, in...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Petroleum Science and Engineering
سال: 2021
ISSN: 0920-4105
DOI: 10.1016/j.petrol.2020.108133