A long lead time forecast model applying an ensemble approach for managing the great Karun multi-reservoir system

نویسندگان

چکیده

Abstract Flow prediction is regarded as a major computational process in strategic water resources planning. Prediction’s lead time has an inverse relationship with results’ accuracy and certainty. This research studies the impact of climate-atmospheric indices on surface runoff predictions long time. To this end, correlation 36 long-distance climate was examined at 10 key nodes Great Karun multi-reservoir system Iran, higher are divided into 4 different groups. Then, using Artificial Neural Network (ANN) Ensemble Learning to combine input variables, flow predicted 6-month horizons, results compared observed values. assess extending time, from proposed model those monthly model. The performed comparison shows that ensemble approach improves final significantly. Moreover, Tropical Pacific SST EOF, Caribbean SST, Nino1 + 2 found be influential parameters basin’s inflow. It performance varies hydrological conditions best obtained for dry seasons.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

the use of appropriate madm model for ranking the vendors of mci equipments using fuzzy approach

abstract nowadays, the science of decision making has been paid to more attention due to the complexity of the problems of suppliers selection. as known, one of the efficient tools in economic and human resources development is the extension of communication networks in developing countries. so, the proper selection of suppliers of tc equipments is of concern very much. in this study, a ...

15 صفحه اول

A proposed model for designing an electronic system for managing patient transfer

Background: Information technology application in health care is increasing. The aim of  this study, is to introduce a scientific model for designing an electronic system for managing patient transfer. Materials and Methods: This study is an exploratory qualitative study. At first a review of literature was carried out for identifying clinical, managerial and process indicators necessary for p...

متن کامل

A queuing-location model for in multi-product supply chain with lead time under uncertainty

Supply chain network design (SCND) problem has recently been gaining attention because an integrated management of the supply chain (SC) can reduce the unexpected/undesirable events and can affect definitely the efficiency of all the chain. A critical component of the planning activities of a manufacturing firm is the efficient design of its SC. Hence, SCND affords a sensitive platform for effi...

متن کامل

Automatic Generation of a Multi Agent System for Crisis Management by a Model Driven Approach

Considering the increasing occurrences of unexpected events and the need for pre-crisis planning in order to reduce risks and losses, modeling instant response environments is needed more than ever. Modeling may lead to more careful planning for crisis-response operations, such as team formation, task assignment, and doing the task by teams. A common challenge in this way is that the model shou...

متن کامل

A Multi-UAV Targeting Algorithm for Ensemble Forecast Improvement

This paper presents an algorithm for targeting a team of UAVs as sensor platforms to ensure the improvement in the forecast at a separate verification time and location within the ensemble forecast framework. The information gain at the verification time/space is used as a metric of the forecast uncertainty reduction, and a computationally efficient backward selection method forms the backbone ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Applied Water Science

سال: 2023

ISSN: ['2190-5495', '2190-5487']

DOI: https://doi.org/10.1007/s13201-023-01924-3