A Job Sequencing Problem of an Overhead Shuttle Crane in a Rail-Based Automated Container Terminal

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The Quay Crane Deployment Problem at a Maritime Container Terminal

Container unloading/loading at marine container terminals (MCTs) is a key logistic process, to which some research efforts have been addressed by using mathematical programming models formulated in a deterministic-static environment. Vice versa, DES models in a stochastic-dynamic environment are well capable of representing the entire process. Hence, simulation results to be an effective planni...

متن کامل

Rail Mounted Gantry Crane Scheduling Optimization in Railway Container Terminal Based on Hybrid Handling Mode

Rail mounted gantry crane (RMGC) scheduling is important in reducing makespan of handling operation and improving container handling efficiency. In this paper, we present an RMGC scheduling optimization model, whose objective is to determine an optimization handling sequence in order to minimize RMGC idle load time in handling tasks. An ant colony optimization is proposed to obtain near optimal...

متن کامل

A New Approach for Sequencing Loading and Unloading Operations in the Seaside Area of a Container Terminal

Due to the considerable growth in the worldwide container transportation, optimization of container terminal operations is becoming highly needed to rationalize the use of logistics resources. For this reason, we focus our study on the Quay Crane Scheduling Problem (QCSP), which is a core task of managing maritime container terminals. From this planning problem arise two decisions to be made: T...

متن کامل

A Branch-and-Cut Algorithm for the Quay Crane Scheduling Problem in a Container Terminal

The quay crane scheduling problem consists of determining a sequence of unloading and loading movements for cranes assigned to a vessel, in order to minimize the vessel completion time as well as the crane idle times. Idle times originate from interferences between cranes since these roll on the same rails and a minimum safety distance must be maintained between them. The productivity of contai...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IEEE Access

سال: 2020

ISSN: 2169-3536

DOI: 10.1109/access.2020.3019004