A hybrid solution approach for a multi-objective closed-loop logistics network under uncertainty
نویسندگان
چکیده
منابع مشابه
A hybrid solution approach for a multi-objective closed-loop logistics network under uncertainty
The design of closed-loop logistics (forward and reverse logistics) has attracted growing attention with the stringent pressures of customer expectations, environmental concerns and economic factors. This paper considers a multi-product, multi-period and multi-objective closed-loop logistics network model with regard to facility expansion as a facility location–allocation problem, which more cl...
متن کاملAn Optimization Model for Multi-objective Closed-loop Supply Chain Network under uncertainty: A Hybrid Fuzzy-stochastic Programming Method
In this research, we address the application of uncertaintyprogramming to design a multi-site, multi-product, multi-period,closed-loop supply chain (CLSC) network. In order to make theresults of this article more realistic, a CLSC for a case study inthe iron and steel industry has been explored. The presentedsupply chain covers three objective functions: maximization ofprofit, minimization of n...
متن کاملan optimization model for multi-objective closed-loop supply chain network under uncertainty: a hybrid fuzzy-stochastic programming method
in this research, we address the application of uncertaintyprogramming to design a multi-site, multi-product, multi-period,closed-loop supply chain (clsc) network. in order to make theresults of this article more realistic, a clsc for a case study inthe iron and steel industry has been explored. the presentedsupply chain covers three objective functions: maximization ofprofit, minimization of n...
متن کاملA Hybrid Solution Method for Hub-and-Spoke Network Design under Uncertainty
Supply chain is an integrated system of facilities and activities. Gaining the optimum design of demand satisfaction network is one of the most important live issues in the decision making problems category. Most of previous studies considered unreal assumptions such as the lack of capacity constraints to satisfy demand in the network and in hubs. By considering the nature of the case that have...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Industrial Engineering International
سال: 2014
ISSN: 1735-5702,2251-712X
DOI: 10.1007/s40092-014-0089-z