A Hybrid Model Based on Fuzzy AHP and Fuzzy WASPAS for Construction Site Selection
نویسندگان
چکیده
منابع مشابه
A Grey-Based Fuzzy ELECTRE Model for Project Selection
Project selection is considered as an important problem in project management. It is multi-criteria in nature and is based on various quantitative and qualitative factors. The main purpose of this paper is to present a new rank-based method for project selection in outranking relation. According to this approach, decision alternatives were clustered in the concordance matrix and the discordance...
متن کامل Airline Alliances Partner Selection in Uncertain Environment: A Fuzzy Hybrid Evaluation Model Based on BSC
With respect to the importance of commercial alliances in airline hypercompetitive environment, partner performance evaluation is a critical matter before making any decision about partnership. In this article, utilizing Fuzzy theory, a hybrid airline evaluation model is developed in a way that all airline performance strategic dimensions are considered, as well as, it can deal with qualitative...
متن کاملCombination of Fuzzy and AHP Method Using for E-waste Site Selection (Case Study: Qom Province)
Electronic waste is one of the most widely used devices in today's modern world, which includes computers, monitors, mobile phones, TVs, and so on. They are growing rapidly. Most of the components used in electronic equipments contain pollutants such as cadmium, lead and zinc. Qom province is not excluded from this issue, and due to the high production of this type of waste and the limitation o...
متن کاملComparison of Fuzzy logic, AHP, FAHP and Hybrid Fuzzy AHP for new supplier selection and its performance analysis
The supplier selection exercise is a critical factor towards the success of a company. This paper compares four different methods to support decision makers in selecting the most appropriate supplier. When using Fuzzy logic, the importance of each criterion gets influenced by the level of decomposition in the hierarchical model. Fuzzy logic does not have the capability to measure the level of c...
متن کاملConstruction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies
Construction projects are initiated in dynamic environment which result in circumstances of high uncertainty and risks due to accumulation of many interrelated parameters. The purpose of this study is to use novel analytic tools to evaluate the construction projects and their overall risks under incomplete and uncertain situations. It was also aimed to place the risk in a proper category and pr...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Computers Communications & Control
سال: 2015
ISSN: 1841-9836,1841-9836
DOI: 10.15837/ijccc.2015.6.2078