This paper deals with the flow shop scheduling problem. To find optimal solution is an NP-hard The reviews some algorithms from literature and applies a benchmark dataset to evaluate their efficiency. In this research work, discrete bacterial memetic evolutionary algorithm (DBMEA) as global searcher was investigated. proposed improves local search by applying simulated annealing (SA). presents experimental results of solving no-idle compare other researchers’ problem set used. calculated makespan times were compared against best-known solutions in literature. hybrid has provided better than methods using genetic variants, thus it major improvement for family production problems.
منابع مشابه
A cloud-based simulated annealing algorithm for order acceptance problem with weighted tardiness penalties in permutation flow shop scheduling
Make-to-order is a production strategy in which manufacturing starts only after a customer's order is received; in other words, it is a pull-type supply chain operation since manufacturing is carried out as soon as the demand is confirmed. This paper studies the order acceptance problem with weighted tardiness penalties in permutation flow shop scheduling with MTO production strategy, the objec...
متن کاملOptimizing Bicriteria Flow Shop Scheduling Problem By Simulated Annealing Algorithm
We consider the flow shop scheduling problem with minimizing two criteria simultaneously: the total completion time (makespan) and the sum of tardiness of jobs. The problem is strongly NP-hard, since for each separate criteria the problem is strongly NP-hard. There is a number of heuristic algorithms to solve the flow shop problem with various single objectives, but usage of those heuristics to...
متن کاملA multi-objective genetic algorithm (MOGA) for hybrid flow shop scheduling problem with assembly operation
Scheduling for a two-stage production system is one of the most common problems in production management. In this production system, a number of products are produced and each product is assembled from a set of parts. The parts are produced in the first stage that is a fabrication stage and then they are assembled in the second stage that usually is an assembly stage. In this article, the first...
متن کاملA Simulated Annealing Algorithm for Multi Objective Flexible Job Shop Scheduling with Overlapping in Operations
In this paper, we considered solving approaches to flexible job shop problems. Makespan is not a good evaluation criterion with overlapping in operations assumption. Accordingly, in addition to makespan, we used total machine work loading time and critical machine work loading time as evaluation criteria. As overlapping in operations is a practical assumption in chemical, petrochemical, and gla...
متن کاملA hybrid immune simulated annealing algorithm for the job shop scheduling problem
A hybrid simulated annealing algorithm based on a novel immune mechanism is proposed for the job shop scheduling problem with the objective of minimizing total weighted tardiness. The proposed immune procedure is built on the following fundamental idea: the bottleneck jobs existing in each scheduling instance generally constitute the key factors in the attempt to improve the quality of final sc...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Symmetry
سال: 2021
ISSN: ['0865-4824', '2226-1877']
DOI: https://doi.org/10.3390/sym13071131