A Heuristic for Group Scheduling the Multi-stage Hybrid Flow Shop Problems

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A heuristic approach for multi-stage sequence-dependent group scheduling problems

We present several heuristic algorithms based on tabu search for solving the multi-stage sequence-dependent group scheduling (SDGS) problem by considering minimization of makespan as the criterion. As the problem is recognized to be strongly NP-hard, several meta (tabu) search-based solution algorithms are developed to efficiently solve industry-size problem instances. Also, two different initi...

متن کامل

Modeling and scheduling no-idle hybrid flow shop problems

Although several papers have studied no-idle scheduling problems, they all focus on flow shops, assuming one processor at each working stage. But, companies commonly extend to hybrid flow shops by duplicating machines in parallel in stages. This paper considers the problem of scheduling no-idle hybrid flow shops. A mixed integer linear programming model is first developed to mathematically form...

متن کامل

A multi-objective genetic algorithm (MOGA) for hybrid flow shop scheduling problem with assembly operation

Scheduling for a two-stage production system is one of the most common problems in production management. In this production system, a number of products are produced and each product is assembled from a set of parts. The parts are produced in the first stage that is a fabrication stage and then they are assembled in the second stage that usually is an assembly stage. In this article, the first...

متن کامل

modeling and scheduling no-idle hybrid flow shop problems

although several papers have studied no-idle scheduling problems, they all focus on flow shops, assuming one processor at each working stage. but, companies commonly extend to hybrid flow shops by duplicating machines in parallel in stages. this paper considers the problem of scheduling no-idle hybrid flow shops. a mixed integer linear programming model is first developed to mathematically form...

متن کامل

Hybrid stage shop scheduling

The proposed hybrid stage shop scheduling (HSSS) model, inspired from a real case in the high-fashion industry, aims to fully exploit the potential of parallel resources, splitting and overlapping concurrent operations among teams of multifunctional machines and operators on the same job. The HSSS formally extends mixed shop scheduling (a combination of flowshop and open shop), which is able to...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Bonfring International Journal of Industrial Engineering and Management Science

سال: 2016

ISSN: 2250-1096,2277-5056

DOI: 10.9756/bijiems.7623