A green multi-period inventory routing problem with pickup and split delivery: A case study in flour industry
نویسندگان
چکیده
منابع مشابه
Designing a green location routing inventory problem considering transportation risks and time window: a case study
This study introduces a green location, routing and inventory problem with customer satisfaction, backup distribution centers and risk of routes in the form of a non-linear mixed integer programming model. In this regard, time window is considered to increase the customer satisfaction of the model and transportation risks is taken into account for the reliability of the system. In addition, dif...
متن کاملA particle swarm optimization method for periodic vehicle routing problem with pickup and delivery in transportation
In this article, multiple-product PVRP with pickup and delivery that is used widely in goods distribution or other service companies, especially by railways, was introduced. A mathematical formulation was provided for this problem. Each product had a set of vehicles which could carry the product and pickup and delivery could simultaneously occur. To solve the problem, two meta-heuristic methods...
متن کاملThe fuzzy multi-depot vehicle routing problem with simultaneous pickup and delivery: Formulation and a heuristic algorithm
In this paper, the fuzzy multi-depot vehicle routing problem with simultaneous pickup and delivery (FMDVRP-SPD) is investigated. The FMDVRP-SPD is the problem of allocating customers to several depots, so that the optimal set of routes is determined simultaneously to serve the pickup and the delivery demands of each customer within scattered depots. In the problem, both pickup and delivery dema...
متن کاملNew mathematical modeling for a location–routing–inventory problem in a multi-period closed-loop supply chain in a car industry
This paper studies a location–routing–inventory problem in a multi-period closed-loop supply chain with multiple suppliers, producers, distribution centers, customers, collection centers, recovery, and recycling centers. In this supply chain, centers are multiple levels, a price increase factor is considered for operational costs at centers, inventory and shortage (including lost sales and back...
متن کاملBi-objectives Approach for a Multi-period Two Echelons Perishable Product Inventory-routing Problem with Production and Lateral Transshipment
In this study, a two echelons supply chain system in which a supplier is producing perishable product and distribute it to multiple customers is considered. By allowing lateral transshipment mechanism, it is also possible to deliver products to some customers in some periods in bulk, then customers using their own vehicle to transship goods between each other seeking further reduction in the ov...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Sustainable Operations and Computers
سال: 2021
ISSN: 2666-4127
DOI: 10.1016/j.susoc.2021.04.002