A GRASP Approach for Solving Large-Scale Electric Bus Scheduling Problems

نویسندگان

چکیده

Electrifying public bus transportation is a critical step in reaching net-zero goals. In this paper, the focus on problem of optimal scheduling an electric (EB) fleet to cover transport timetable. The modelled using mixed integer program (MIP) which charging time EB pertinent battery’s state-of-charge level. To be able solve large instances corresponding real-world applications model, metaheuristic approach investigated. more precise, greedy randomized adaptive search procedure (GRASP) algorithm developed and its performance evaluated against solutions acquired MIP. GRASP used for case studies several systems having various properties sizes. analysis focuses relation between ranges (battery capacity) required rates (in kW) size needed results conducted computational experiments indicate that increase infrastructure investment through high speed chargers can significantly decrease necessary fleets. also show have significant impact than battery sizes EBs.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Hybrid Approach for Solving Large Scale Crew Scheduling Problems

We consider several strategies for computing optimal solutions to large scale crew scheduling problems. Provably optimal solutions for very large real instances of such problems were computed using a hybrid approach that integrates mathematical and constraint programming techniques. The declarative nature of the latter proved instrumental when modeling complex problem restrictions and, particul...

متن کامل

Progress in solving large scale multi-depot multi-vehicle-type bus scheduling problems with integer programming

This paper discusses solution methods of multi-depot, multi-vehicle-type bus scheduling problems (MDVSP), involving multiple depots for vehicles and different vehicle types for timetabled trips. All models are from real-life applications. Key elements of the application are a mixed-integer model based on time-space-based networks for MDVSP modeling and a customized version of the mathematical o...

متن کامل

A New Play-off Approach in League Championship Algorithm for Solving Large-Scale Support Vector Machine Problems

There are many numerous methods for solving large-scale problems in which some of them are very flexible and efficient in both linear and non-linear cases. League championship algorithm is such algorithm which may be used in the mentioned problems. In the current paper, a new play-off approach will be adapted on league championship algorithm for solving large-scale problems. The proposed algori...

متن کامل

A Statistical Approach to Adaptive Problem-Solving for Large-Scale Scheduling and Resource-Allocation Problems

Our work focuses upon development of techniques for choosing among a set of altematives in the presence of incomplete information and varying costs of acquiring information. In our approach, we model the cost and utility of various alternatives using parameterized statistical models. By applying techniques from an area of statistics called parameter estimation, statistical models can be inferre...

متن کامل

Solving Large Scale Crew Scheduling Problems by using Iterative Partitioning

This paper deals with large-scale crew scheduling problems arising at the Dutch railway operator, Netherlands Railways (NS). NS operates about 30,000 trains a week. All these trains need a driver and a certain number of conductors. No available crew scheduling algorithm can solve such huge instances at once. A common approach to deal with these huge weekly instances, is to split them into sever...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Energies

سال: 2021

ISSN: ['1996-1073']

DOI: https://doi.org/10.3390/en14206610