A Genetic Algorithm for Task Scheduling on NoC Using FDH Cross Efficiency
نویسندگان
چکیده
منابع مشابه
BCC-DPSO Algorithm for Task Scheduling on NOC
In this paper, a BCC-DPSO scheduling algorithm is proposed to solve multi-objective optimization problem for task scheduling on Network-on-Chip (NoC). In our proposal, the relative advantage of the solution is evaluated by calculating its efficiency using BCC model in Data Envelopment Analysis (DEA), and the referred-time method is introduced to rank the BCC-efficient solution. Moreover, a sub-...
متن کاملAn Efficient Genetic Algorithm for Task Scheduling on Heterogeneous Computing Systems Based on TRIZ
An efficient assignment and scheduling of tasks is one of the key elements in effective utilization of heterogeneous multiprocessor systems. The task scheduling problem has been proven to be NP-hard is the reason why we used meta-heuristic methods for finding a suboptimal schedule. In this paper we proposed a new approach using TRIZ (specially 40 inventive principles). The basic idea of thi...
متن کاملAn Efficient Genetic Algorithm for Task Scheduling on Heterogeneous Computing Systems Based on TRIZ
An efficient assignment and scheduling of tasks is one of the key elements in effective utilization of heterogeneous multiprocessor systems. The task scheduling problem has been proven to be NP-hard is the reason why we used meta-heuristic methods for finding a suboptimal schedule. In this paper we proposed a new approach using TRIZ (specially 40 inventive principles). The basic idea of thi...
متن کاملA Genetic Algorithm for Multiprocessor Task Scheduling
The goal of task scheduling in a multiprocessor system is to schedule dependent tasks on processors such that the processing time is minimized. This ensures optimal usage of the processing systems. However this problem is NP-hard in nature and heuristic based techniques are used to obtain a good schedule in polynomial time. Genetic Algorithms (GA) have been proposed over other heuristics becaus...
متن کاملA Genetic Algorithm Developed for a Supply Chain Scheduling Problem
This paper concentrates on the minimization of total tardiness and earliness of orders in an integrated production and transportation scheduling problem in a two-stage supply chain. Moreover, several constraints are also considered, including time windows due dates, and suppliers and vehicles availability times. After presenting the mathematical model of the problem, a developed version of GA c...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Mathematical Problems in Engineering
سال: 2013
ISSN: 1024-123X,1563-5147
DOI: 10.1155/2013/708495