A Fuzzy generalized simulated annealing for a simple assembly line balancing problem
نویسندگان
چکیده
منابع مشابه
genetic algorithms for assembly line balancing problem
there are some machineries and equipments as well as relatively fix amount of human resources involved in any production process. in many cases, by observing operational method of a process, one may see that some of these machineries are not working, but on the other hand, other equipments are continuously working, and many parts are set in front of them, waiting to be set up over machines to c...
متن کاملUsing simulated annealing to solve a multiobjective assembly line balancing problem with parallel workstations
This research presents a Simulated Annealing based technique to address the assembly line balancing problem for multiple objective problems when paralleling of workstations is permitted. The Simulated Annealing methodology is used for 23 line balancing strategies across seven problems. The resulting performance of each solution was studied through a simulation experiment. Many of the problems c...
متن کاملA cost-oriented model for multi-manned assembly line balancing problem
In many real world assembly line systems which the work-piece is of large size more than one worker work on the same work-piece in each station. This type of assembly line is called multi-manned assembly line (MAL). In the classical multi-manned assembly line balancing problem (MALBP) the objective is to minimize the manpower needed to manufacture one product unit. Apart from the manpower, othe...
متن کاملA new Simulated Annealing algorithm for the robust coloring problem
The Robust Coloring Problem (RCP) is a generalization of the well-known Graph Coloring Problem where we seek for a solution that remains valid when extra edges are added. The RCP is used in scheduling of events with possible last-minute changes and study frequency assignments of the electromagnetic spectrum. This problem has been proved as NP-hard and in instances larger than 30 vertices, meta-...
متن کاملFuzzy multi-objective assembly line balancing problem: Fuzzy mathematical programming approach
Design of assembly line is done in order to more coordinate a collection of some consecutive work stations for the aim of obtaining more productivity from the work stations and workers. The stations are arranged in a way to have a continuous and constant material flow. In this paper a multi-objective formulation for assembly line balancing is introduced. As a solution approach a two-step approa...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IFAC-PapersOnLine
سال: 2018
ISSN: 2405-8963
DOI: 10.1016/j.ifacol.2018.11.489