A Foraging Cost of Migration for a Partially Migratory Cyprinid Fish

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Foraging Cost of Migration for a Partially Migratory Cyprinid Fish

Migration has evolved as a strategy to maximise individual fitness in response to seasonally changing ecological and environmental conditions. However, migration can also incur costs, and quantifying these costs can provide important clues to the ultimate ecological forces that underpin migratory behaviour. A key emerging model to explain migration in many systems posits that migration is drive...

متن کامل

Migration confers survival benefits against avian predators for partially migratory freshwater fish.

The importance of predation risk in shaping patterns of animal migration is not well studied, mostly owing to difficulties in accurately quantifying predation risk for migratory versus resident individuals. Here, we present data from an extensive field study, which shows that migration in a freshwater fish (roach, Rutilus rutilus) that commonly migrates from lakes to streams during winter confe...

متن کامل

Migration confers winter survival benefits in a partially migratory songbird

To evolve and to be maintained, seasonal migration, despite its risks, has to yield fitness benefits compared with year-round residency. Empirical data supporting this prediction have remained elusive in the bird literature. To test fitness related benefits of migration, we studied a partial migratory population of European blackbirds (Turdus merula) over 7 years. Using a combination of capture...

متن کامل

A Partially Observable Markovian Maintenance Process with Continuous Cost Functions

In this paper a two-state Markovian maintenance process where the true state is unknown will be considered. The operating cost per period is a continuous random variable which depends on the state of the process. If investigation cost is incurred at the beginning of any period, the system wit I be returned to the "in-control" state instantaneously. This problem is solved using the average crite...

متن کامل

investigating the feasibility of a proposed model for geometric design of deployable arch structures

deployable scissor type structures are composed of the so-called scissor-like elements (sles), which are connected to each other at an intermediate point through a pivotal connection and allow them to be folded into a compact bundle for storage or transport. several sles are connected to each other in order to form units with regular polygonal plan views. the sides and radii of the polygons are...

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: PLoS ONE

سال: 2013

ISSN: 1932-6203

DOI: 10.1371/journal.pone.0061223