A Flow Shop Scheduling Problem with Transportation Time and Separated Setup Time of Jobs

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

On Specially Structured Two Stage Flow Shop Scheduling Problem with Setup Time Separated from Processing Time and Jobs in a String of Disjoint Job Blocks

This paper relates to two stage specially structured flow shop scheduling problem with jobs in a string of disjoint job blocks having sequence independent setup times separated from processing times each associated with their respective probabilities, where the optimization criteria is the utilization time of machines. To minimize the utilization time an algorithm is proposed and a numerical ex...

متن کامل

an assembly flow-shop scheduling problem with sequence-dependent setup and transportation times

in this paper, three-stage assembly flowshop scheduling is considered with respect to minimizing bi-objectives, namely mean flow time and mean tardiness. this problem is a model of production systems, which several production operations are done simultaneously and independently, and then produced components are collected and transferred to an assembly stage for the final operation. in this mode...

متن کامل

Optimal Two Stages Specially Structured Flow Shop Scheduling: Minimize the Rental Cost with Independent Setup Time

One of the earliest results in flow shop scheduling theory is an algorithm given by Johnson’s [1] for scheduling jobs on two or three machines to minimize the total elapsed time whenever the processing times of jobs are random. The present paper is an attempt to develop a heuristic algorithm for two stages specially structured flow shop scheduling in which the processing times of the jobs a...

متن کامل

The Preemptive Just-in-time Scheduling Problem in a Flow Shop Scheduling System

Flow shop scheduling problem has a wide application in the manufacturing and has attracted much attention in academic fields. From other point, on time delivery of products and services is a major necessity of companies’ todays; early and tardy delivery times will result additional cost such as holding or penalty costs.  In this paper, just-in-time (JIT) flow shop scheduling problem with preemp...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Procedia Engineering

سال: 2012

ISSN: 1877-7058

DOI: 10.1016/j.proeng.2012.06.163