A Flow Shop Rank Approach to GT Scheduling.(Dept.M)

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Flow shop Scheduling Problem with Maintenance Coordination: a New Approach

This study investigates the coordination of production scheduling and maintenance planning in theflow shop scheduling environment. The problem is considered in a bi-objective form, minimizing themakespan as the production scheduling criterion and minimizing the system unavailability as themaintenance planning criterion. The time interval between consecutive maintenance activities as well as the...

متن کامل

A Fuzzy Approach to Capacitated Flow Shop Scheduling

This paper presents a fuzzy approach to capacitated flow shop scheduling problem. Fuzzy sets are applied to express the flexible constraints on capacity of each period in the scheduling horizon. Fuzzy sets are also used to model the processing times of jobs and the setup times of machines required when a new job starts processing. Demand is set for each period. Over production incurs the holdin...

متن کامل

Heuristic approach to solve hybrid flow shop scheduling problem with unrelated parallel machines

In hybrid flow shop scheduling problem (HFS) with unrelated parallel machines, a set of n jobs are processed on k machines. A mixed integer linear programming (MILP) model for the HFS scheduling problems with unrelated parallel machines has been proposed to minimize the maximum completion time (makespan). Since the problem is shown to be NP-complete, it is necessary to use heuristic methods to ...

متن کامل

flow shop scheduling problem with maintenance coordination: a new approach

this study investigates the coordination of production scheduling and maintenance planning in theflow shop scheduling environment. the problem is considered in a bi-objective form, minimizing themakespan as the production scheduling criterion and minimizing the system unavailability as themaintenance planning criterion. the time interval between consecutive maintenance activities as well as the...

متن کامل

An Ant Approach to the Flow Shop Problem

In this article we present an Ant Colony Optimization approach to the Flow Shop Problem. ACO is a new algorithmic approach, inspired by the foraging behavior of real ants, that can be applied to the solution of combinatorial optimization problems. Artificial ants are used to construct solutions for Flow Shop Problems that subsequently are improved by a local search procedure. Comparisons with o...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: MEJ. Mansoura Engineering Journal

سال: 2021

ISSN: 2735-4202

DOI: 10.21608/bfemu.2021.159318