A discrete event simulation approach for mine development planning at Codelco's New Mine Level

نویسندگان

چکیده

The new caving megaprojects that are planned to go into production in the next decade have scheduled horizontal developments at very high rates, which difficult achieve. Research has been conducted seeks model construction times for underground determine feasibility of achieving rates. However, these previous attempts do not consider all operational aspects make up mine development cycle. Here, we present a discrete event simulation (DES) individualizes each unit operation cycle rates projects will be able attain. developed was applied New Mine Level (NML) El Teniente Division (DET). results indicate it would impractical achieve advance original plans if operations continue executed using status quo. metres after six years sections analysed can significantly improved by changing maintenance strategy equipment (457 increase), orepass availability (194 and initial planning sequence (1 598 increase). It is recommended implements flexible strategy, defines ensure increase contractors, makes use current tools more robust planning.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A New Approach to Mine Frequent Itemsets

Mining frequent patterns in transaction databases and many other kinds of databases has been studied popularly in data mining research. Methods for efficient mining of frequent itemsets have been studied extensively by many researchers. However, the previously proposed methods still encounter some performance bottlenecks when mining databases with different data characteristics. The time requir...

متن کامل

Path Planning for Mine Countermeasures

We have developed path-planning techniques and tools to look for paths through minefields. Our techniques seek to balance the length and risk associated with different routes through a minefield. Our methods are intended to provide battlegroup commanders powerful new tools to evaluate alternative routes while searching for low risk paths. It is well known how to find the path of shortest distan...

متن کامل

A genetic algorithm approach for open-pit mine production scheduling

In an Open-Pit Production Scheduling (OPPS) problem, the goal is to determine the mining sequence of an orebody as a block model. In this article, linear programing formulation is used to aim this goal. OPPS problem is known as an NP-hard problem, so an exact mathematical model cannot be applied to solve in the real state. Genetic Algorithm (GA) is a well-known member of evolutionary algorithms...

متن کامل

Modern Strategic Mine Planning

If you are in a shipwreck and all the boats are gone, a piano top...that comes along makes a fortuitous life preserver. But this is not to say that the best way to design a life preserver is in the form of a piano top. I think that we are clinging to a great many piano tops in accepting yesterday’s fortuitous contrivings as constituting the only means for solving a given problem. (Fuller 1969, ...

متن کامل

Performance evaluation of a new stochastic network flow approach to optimal open pit mine design–application at a gold mine

An orebody model constitutes a threedimensional accumulation of mining units (blocks). The available metal content in a mining unit and the economic parameters, such as metal price, mining cost, processing cost, marketing or selling cost, as well as the metallurgical recovery, are used to calculate the economic value of a particular mining block. A mining block with a positive value is classifi...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of The South African Institute of Mining and Metallurgy

سال: 2022

ISSN: ['2411-9717', '0038-223X']

DOI: https://doi.org/10.17159/2411-9717/2045/2022