A critical-path based iterated local search for the green permutation flowshop problem

نویسندگان

چکیده

The permutation flowshop scheduling problem is a widely studied combinatorial optimization with several real-world applications. In this paper we address green variant of the controllable processing times and two objective functions: one related to service level factory (makespan) another total cost or energy/carbon consumption. For propose novel Critical-Path based Iterated Local Search. This metaheuristic incorporates theoretical results accelerate search solutions in intensification phase. proposed algorithm has been compared on an extensive benchmark most promising algorithms literature. computational show excellent performance proposal.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Applying Iterated Local Search to the Permutation Flow Shop Problem

Iterated local search (ILS) is a general and powerful metaheuristic which provides an easily implementable way of improving the performance of local search algorithms. In this article we consider the application of ILS to the permutation flow shop problem (FSP), a strongly studied problem in machine scheduling. We experimentally investigate the effect of specific implementation choices in our I...

متن کامل

Permutation Flowshop Scheduling by Genetic Local Search

In this paper, the landscape for the permutation flowshop scheduling problem (PFSP) with stochastic local search and a critical block-based neighbourhood structure has been investigated. Numerical experiments using small benchmark problems show that there are good correlations between the makespans of local optima, the average distances to other local optima and the distances to the known globa...

متن کامل

Iterated Local Search Algorithm for the Constrained Two-Dimensional Non-Guillotine Cutting Problem

An Iterated Local Search method for the constrained two-dimensional non-guillotine cutting problem is presented. This problem consists in cutting pieces from a large stock rectangle to maximize the total value of pieces cut. In this problem, we take into account restrictions on the number of pieces of each size required to be cut. It can be classified as 2D-SLOPP (two dimensional single large o...

متن کامل

A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problem

Over the last decade many metaheuristics have been applied to the flowshop scheduling problem, ranging from Simulated Annealing or Tabu Search to complex hybrid techniques. Some of these methods provide excellent effectiveness and efficiency at the expense of being utterly complicated. In fact, several published methods require substantial implementation efforts, exploit problem specific speed-...

متن کامل

Solving the Csum Permutation Flowshop Scheduling Problem by Genetic Local Search

In this paper a new metaheuristic method is proposed to solve the classical permutation flowshop scheduling problem with the objective of minimizing sum of completion times. The representative neighbourhood combines the stochastic sampling method mainly used in Simulated Annealing and the best descent method elaborated in Tabu Search and integrates them naturally into a single method. The metho...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Computers & Industrial Engineering

سال: 2022

ISSN: ['0360-8352', '1879-0550']

DOI: https://doi.org/10.1016/j.cie.2022.108276