A Cooperative Scheduling Method with Genetic Algorithm for CIM
نویسندگان
چکیده
منابع مشابه
A Genetic Algorithm Developed for a Supply Chain Scheduling Problem
This paper concentrates on the minimization of total tardiness and earliness of orders in an integrated production and transportation scheduling problem in a two-stage supply chain. Moreover, several constraints are also considered, including time windows due dates, and suppliers and vehicles availability times. After presenting the mathematical model of the problem, a developed version of GA c...
متن کاملA genetic algorithm approach for open-pit mine production scheduling
In an Open-Pit Production Scheduling (OPPS) problem, the goal is to determine the mining sequence of an orebody as a block model. In this article, linear programing formulation is used to aim this goal. OPPS problem is known as an NP-hard problem, so an exact mathematical model cannot be applied to solve in the real state. Genetic Algorithm (GA) is a well-known member of evolutionary algorithms...
متن کاملEffective genetic operators of cooperative genetic algorithm for nurse scheduling
This paper proposes effective genetic operators for cooperative genetic algorithm (GA) to solve a nurse scheduling problem. A clinical director of a medical department makes a duty schedule of all nurses of the department every month. Such the scheduling is very complex task. It takes one or two weeks to create the nurse schedule even by a veteran director. In conventional ways using the cooper...
متن کاملStaff Scheduling by a Genetic Algorithm
This paper describes a Genetic Algorithms approach to amanpower-scheduling problem arising at a Petrochemical Company. AlthoughGenetic Algorithms have been successfully used for similar problemsin the past, they always had to overcome the limitations of theclassical Genetic Algorithms paradigm in handling the conflict betweenobjectives and constraints. The approach taken here is to use an indir...
متن کاملA multi-objective genetic algorithm (MOGA) for hybrid flow shop scheduling problem with assembly operation
Scheduling for a two-stage production system is one of the most common problems in production management. In this production system, a number of products are produced and each product is assembled from a set of parts. The parts are produced in the first stage that is a fabrication stage and then they are assembled in the second stage that usually is an assembly stage. In this article, the first...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Transactions of the Society of Instrument and Control Engineers
سال: 1995
ISSN: 0453-4654
DOI: 10.9746/sicetr1965.31.606