A Consistent Fuzzy Preference Relations Based ANP Model for R&D Project Selection

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Consistent Fuzzy Preference Relations Based ANP Model for R&D Project Selection

In today’s rapidly changing economy, technology companies have to make decisions on research and development (R&D) projects investment on a routine bases with such decisions having a direct impact on that company’s profitability, sustainability and future growth. Companies seeking profitable opportunities for investment and project selection must consider many factors such as resource limitatio...

متن کامل

A Grey-Based Fuzzy ELECTRE Model for Project Selection

Project selection is considered as an important problem in project management. It is multi-criteria in nature and is based on various quantitative and qualitative factors. The main purpose of this paper is to present a new rank-based method for project selection in outranking relation. According to this approach, decision alternatives were clustered in the concordance matrix and the discordance...

متن کامل

Supplier selection using consistent fuzzy preference relations

Supplier selection is usually involved a multi-criteria evaluation to assist decision-making. This study proposed a simple method for vendor selection. The proposed procedure utilizes the structure of criteria in analytic hierarchy process (AHP) model and employs consistent fuzzy preference relations (CFPR) to construct the decision matrices. The advantage of CFPR is computational simplicity an...

متن کامل

A Fuzzy Preference Relations to Service Innovation Project Selection

In order to reduce the bias of linguistic recognitions among the group decision makings, this study develops “fuzzy multiple preference model” with two stages to better determining the suitable service innovation. A real numerical application in the chain wholesale has also been demonstrated.

متن کامل

a grey-based fuzzy electre model for project selection

project selection is considered as an important problem in project management. it is multi-criteria in nature and is based on various quantitative and qualitative factors. the main purpose of this paper is to present a new rank-based method for project selection in outranking relation. according to this approach, decision alternatives were clustered in the concordance matrix and the discordance...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Sustainability

سال: 2017

ISSN: 2071-1050

DOI: 10.3390/su9081352