A computational evaluation of constructive heuristics for the parallel blocking flow shop problem with sequence-dependent setup times

نویسندگان

چکیده

This paper deals with the problem of scheduling jobs in a parallel flow shop environment without buffers between machines and sequence-dependent setup times order to minimize maximum completion time jobs. The blocking constraint normally leads an increase due blockage machines, which can even more so when are considerable. Hence, heuristic solve this must take into account these specificities timeout machines. Because procedures designed deal not only sequencing but also their allocation shops, 36 heuristics have been tested paper, 35 combine rules methods while last one takes different approach that is related nature problem. computational evaluation implemented showed good performance especially for (RCP0) Furthermore, has allowed us propose combined solutions short CPU time.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A three-stage assembly flow shop scheduling problem with blocking and sequence-dependent set up times

This paper considers a three-stage assembly flowshop scheduling problem with sequence-dependent setup < /div> times at the first stage and blocking times between each stage in such a way that the weighted mean completion time and makespan are minimized. Obtaining an optimal solution for this type of complex, large-sized problem in reasonable computational time using traditiona...

متن کامل

Solving Group Scheduling Problem in No-wait Flow Shop with Sequence Dependent Setup Times

Different manufacturing enterprises use regularly scheduling algorithms in order to help meeting demands over time and reducing operational costs. Nowadays, for a better useofresources and manufacturingin accordance withcustomer needs and given the level ofcompetitionbetweencompanies, employing asuitablescheduling programhasa double importance. Conventional productionmethods are constantly subs...

متن کامل

Solving Group Scheduling Problem in No-wait Flow Shop with Sequence Dependent Setup Times

Different manufacturing enterprises use regularly scheduling algorithms in order to help meeting demands over time and reducing operational costs. Nowadays, for a better useofresources and manufacturingin accordance withcustomer needs and given the level ofcompetitionbetweencompanies, employing asuitablescheduling programhasa double importance. Conventional productionmethods are constantly subs...

متن کامل

A comparison of algorithms for minimizing the sum of earliness and tardiness in hybrid flow-shop scheduling problem with unrelated parallel machines and sequence-dependent setup times

In this paper, the flow-shop scheduling problem with unrelated parallel machines at each stage as well as sequence-dependent setup times under minimization of the sum of earliness and tardiness are studied. The processing times, setup times and due-dates are known in advance. To solve the problem, we introduce a hybrid memetic algorithm as well as a particle swarm optimization algorithm combine...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Industrial Engineering Computations

سال: 2021

ISSN: ['1923-2926', '1923-2934']

DOI: https://doi.org/10.5267/j.ijiec.2021.1.004