A comparison of solution approaches for the fixed-sequence economic lot scheduling problem

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The Economic Lot Scheduling Problem in Flow Lines with Sequence-Dependent Setups

  The problem of lot sizing, sequencing and scheduling multiple products in flow line production systems has been studied by several authors. Almost all of the researches in this area assumed that setup times and costs are sequence –independent even though sequence dependent setups are common in practice. In this paper we present a new mixed integer non linear program (MINLP) and a heuristic me...

متن کامل

1 The Economic Lot Scheduling Problem

Economies of scale often dictate the choice of a single high speed machine capable of producing a given set of items over the choice of one dedicated machine for each item in the set. A scheduling problem arises when the high speed machine can only produce one item at a time. The problem is further complicated when the machine needs to be setup (often at a cost of both time and money) before a ...

متن کامل

A Price-Directed Heuristic for the Economic Lot Scheduling Problem

We formulate the well-known economic lot scheduling problem (ELSP) with sequence dependent setup times and costs as a semi-Markov decision process. Using an affine approximation of the bias function, we obtain a semi-infinite linear program determining a lower bound for the minimum average total cost rate. The solution of this problem is directly used in a price-directed dynamic heuristic to de...

متن کامل

the economic lot scheduling problem in flow lines with sequence-dependent setups

the problem of lot sizing, sequencing and scheduling multiple products in flow line production systems has been studied by several authors. almost all of the researches in this area assumed that setup times and costs are sequence –independent even though sequence dependent setups are common in practice. in this paper we present a new mixed integer non linear program (minlp) and a heuristic meth...

متن کامل

A tabu search algorithm for solving economic lot scheduling problem

The economic lot scheduling problem has driven considerable amount of research. The problem is NP-hard and recent research is focused on finding heuristic solutions rather than searching for optimal solutions. This paper introduces a heuristic method using a tabu search algorithm to solve the economic lot scheduling problem. Diversification and intensification schemes are employed to improve th...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IIE Transactions

سال: 1997

ISSN: 0740-817X,1545-8830

DOI: 10.1080/07408179708966317