A common approximation framework for early work, late work, and resource leveling problems

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Resource Theory for Work and Heat

Several recent results in the field of quantum thermodynamics have been obtained using the tools of quantum information theory and resource theories. So far, the resource theories utilised to describe quantum thermodynamics have assumed the existence of an infinite thermal reservoir, by declaring that thermal states at some background temperature come for free. Here, we propose a resource theor...

متن کامل

in translation: translators on their work and what it means

کتاب در باب ترجمه، اثر استر آلن و سوزان برنوفسکی منتشر شده در ماه می 2013 توسط نشریه کلمبیا است. نویسندگان در این کتاب به بررسی 18 مترجم با در نظر گرفتن نقش آثاری که این مترجمان ترجمه کرده اند میپردازند. کتاب به دو بخش تقسیم میشود: " مترجم در جهان" و " کار مترجم" این دو بخش مقالات همیشگی ترجمه و موقعیت خاص ادبیات بیگانه در جهان وسیع امروزی را مورد خطاب قرار میدهد. در این کتاب مقالات متعددی از ن...

Dynamic Characteristics for Leveling System of Mobile Elevating Work Platforms

Focused on revealing variations of dynamic characteristics of an auto-leveling system used in mobile elevating work platforms (MEWP) at large height, a unified mathematical model composited of a series of sub-models was built for the leveling systems. An effect on dynamic characteristics including the fast response and relative stability from varying-parameters was investigated. Results display...

متن کامل

A Late Work by Barocci

Between the years I603 and I607 Federigo Barocci painted his version of the Last Supper for the chapel of the Sacrament in the cathedral of Urbino. The painting remained there until 1789, when the cathedral was partially destroyed by an earthquake and extensive repairs became necessary. The Last Supper was then taken out of the chapel, and, besides the usual damage from exposure to oil lamps an...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: European Journal of Operational Research

سال: 2020

ISSN: 0377-2217

DOI: 10.1016/j.ejor.2020.03.032