A classification and new benchmark instances for the multi-skilled resource-constrained project scheduling problem
نویسندگان
چکیده
This paper studies and analyses the multi-skilled resource-constrained project scheduling problem (MSRCPSP). We present a new classification scheme based on an existing for problems. allows researchers to classify all problems its extensions. Furthermore, we propose data generation procedure MSRCPSP introduce multiple artificial datasets varying research purposes. The are generated resource parameters compared benchmark in literature. A set of 7 empirical instances from software railway construction companies collected order validate quality datasets. Solutions obtained through genetic algorithm by solving mixed-integer linear programming formulation with CPLEX 12.6. hardness is investigated computational experiments. An experimental analysis impact skill availability, workforce size multi-skilling makespan project.
منابع مشابه
The Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem
This paper presents the formulation and solution of the Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem. The focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. The motivation for developing such an approach is due in part to practica...
متن کاملModeling and solving multi-skilled resource-constrained project scheduling problem with calendars in fuzzy condition
In this study, we aim to present a new model for the resource-constrained project scheduling problem (RCPSP) considering a working calendar for project members and determined the skill factor of any member using the efficiency concept. For this purpose, the recyclable resources are staff resources where any person with multiple skills can meet the required skills of activities in a given time. ...
متن کاملAn Evolutionary Algorithm Based on a Hybrid Multi-Attribute Decision Making Method for the Multi-Mode Multi-Skilled Resource-constrained Project Scheduling Problem
This paper addresses the multi-mode multi-skilled resource-constrained project scheduling problem. Activities of real world projects often require more than one skill to be accomplished. Besides, in many real-world situations, the resources are multi-skilled workforces. In presence of multi-skilled resources, it is required to determine the combination of workforces assigned to each activity. H...
متن کاملthe combinatorial multi-mode resource constrained multi-project scheduling problem
this paper presents the formulation and solution of the combinatorial multi-mode resource constrained multi-project scheduling problem. the focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. the motivation for developing such an approach is due in part to practica...
متن کاملA THEORETICALLY CORRECT RESOURCE USAGE VISUALIZATION FOR THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM
The cumulative resource constraints of the resource-constrained project scheduling problem (RCPSP) do not treat the resource demands as geometric rectangles, that is, activities are not necessarily assigned to the same resource units over their processing times. In spite of this fact, most papers on resource-constrained project scheduling mainly in the motivation phase use a strip packing of re...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: European Journal of Operational Research
سال: 2023
ISSN: ['1872-6860', '0377-2217']
DOI: https://doi.org/10.1016/j.ejor.2022.05.049