A CAPACITY-CONSTRAINED SINGLE-FACILITY MULTI-PRODUCT PRODUCTION PLANNING MODEL
نویسندگان
چکیده
منابع مشابه
Building a Multi-Objective Model for Multi-Product Multi-Period Production Planning with Controllable Processing Times: A Real Case Problem
Model building is a fragile and complex process especially in the context of real cases. Each real case problem has its own characteristics with new concepts and conditions. A correct model should have some essential characteristics such as: being compatible with real conditions, being of sufficient accuracy, being logically traceable and etc. This paper discusses how to build an efficient mode...
متن کاملA Production Planning Model for Multi-product Facilities
A PRODUCTION PLANNING MODEL FOR MULTI-PRODUCT FACILITIES Chang Sup Sung Korea Advanced Institute of Science & Technology (Received April 5, 1985: Final September 18, 1985) A production planning model for multi-product facilities is analyzed, in which known demands must be satisfied. In the model, in every production period each facility produces a certain number of items each taking a fixed par...
متن کاملA mixed integer linear programming formulation for a multi-stage, multi-Product, multi-vehicle aggregate production-distribution planning problem
In today’s competitive market place, companies seek an efficient structure of supply chain so as to provide customers with highest value and achieve competitive advantage. This requires a broader perspective than just the borders of an individual company during a supply chain. This paper investigates an aggregate production planning problem integrated with distribution issues in a supply chain ...
متن کاملA production planning model for an unreliable production facility: Case of finite horizon and single demand
We study a two-level inventory system that is subject to failures and repairs. The objective is to minimize the expected total cost so as to determine the production plan for a single quantity demand. The expected total cost consists of the inventory carrying costs for finished and unfinished items, the backlog cost for not meeting the demand due-date, and the planning costs associated with the...
متن کاملA Chance Constrained Integer Programming Model for Open Pit Long-Term Production Planning
The mine production planning defines a sequence of block extraction to obtain the highest NPV under a number of constraints. Mathematical programming has become a widespread approach to optimize production planning, for open pit mines since the 1960s. However, the previous and existing models are found to be limited in their ability to explicitly incorporate the ore grade uncertainty into the p...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of the Operations Research Society of Japan
سال: 1986
ISSN: 0453-4514,2188-8299
DOI: 10.15807/jorsj.29.232