A Bivariate Chance Constraint of Wind Sources for Multi-Objective Dispatching
نویسندگان
چکیده
منابع مشابه
A Chance Constraint Approach to Multi Response Optimization Based on a Network Data Envelopment Analysis
In this paper, a novel approach for multi response optimization is presented. In the proposed approach, response variables in treatments combination occur with a certain probability. Moreover, we assume that each treatment has a network style. Because of the probabilistic nature of treatment combination, the proposed approach can compute the efficiency of each treatment under the desirable reli...
متن کاملsolution of security constrained unit commitment problem by a new multi-objective optimization method
چکیده-پخش بار بهینه به عنوان یکی از ابزار زیر بنایی برای تحلیل سیستم های قدرت پیچیده ،برای مدت طولانی مورد بررسی قرار گرفته است.پخش بار بهینه توابع هدف یک سیستم قدرت از جمله تابع هزینه سوخت ،آلودگی ،تلفات را بهینه می کند،و هم زمان قیود سیستم قدرت را نیز برآورده می کند.در کلی ترین حالتopf یک مساله بهینه سازی غیر خطی ،غیر محدب،مقیاس بزرگ،و ایستا می باشد که می تواند شامل متغیرهای کنترلی پیوسته و گ...
a chance constraint approach to multi response optimization based on a network data envelopment analysis
in this paper, a novel approach for multi response optimization is presented. in the proposed approach, response variables in treatments combination occur with a certain probability. moreover, we assume that each treatment has a network style. because of the probabilistic nature of treatment combination, the proposed approach can compute the efficiency of each treatment under the desirable reli...
متن کاملA Two-Stage Chance-Constraint Stochastic Programming Model for Electricity Supply Chain Network Design
Development of every society is incumbent upon energy sector’s technological and economic effectiveness. The electricity industry is a growing and needs to have a better performance to effectively cover the demand. The industry requires a balance between cost and efficiency through careful design and planning. In this paper, a two-stage stochastic programming model is presented for the design o...
متن کاملA chance-constrained multi-objective model for final assembly scheduling in ATO systems with uncertain sub-assembly availability
A chance-constraint multi-objective model under uncertainty in the availability of subassemblies is proposed for scheduling in ATO systems. The on-time delivery of customer orders as well as reducing the company's cost is crucial; therefore, a three-objective model is proposed including the minimization of1) overtime, idletime, change-over, and setup costs, 2) total dispersion of items’ deliver...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Smart Grid and Renewable Energy
سال: 2013
ISSN: 2151-481X,2151-4844
DOI: 10.4236/sgre.2013.44039