Market power, defined as the ability to raise prices above competitive levels profitably, continues be a prime concern in restructured electricity markets. power must mitigated improve market performance and avoid inefficient generation investment, price volatility, overpayment systems. For this reason, involving transmission expansion planning (TEP) problem is essential for ensuring efficient operation of In regard, methodological bilevel stochastic framework TEP that explicitly includes indices upper level proposed, aiming restrict potential execution. A mixed-integer linear/quadratic programming (MILP/MIQP) reformulation model constructed utilizing Karush−Kuhn−Tucker (KKT) conditions. Wind demand uncertainty are incorporated using scenario-based two-stage programming. The enables planner make trade-off between investment cost. Using comparable results IEEE 118-bus system, we show proposed outperforms existing models terms facilitates open access network all participants.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A New Framework for Reactive Power Market Considering Power System Security

This paper presents a new framework for the day-ahead reactive power market based on the uniform auction price. Voltage stability and security have been considered in the proposed framework. Total Payment Function (TPF) is suggested as the objective function of the Optimal Power Flow (OPF) used to clear the reactive power market. Overload, voltage drop and voltage stability margin (VSM) are inc...

متن کامل

Market Based Transmission Expansion Planning For Indian Power Systems

In this paper a new market Based approach for transmission expansion planning in deregulated power systems is presented. Restructuring and deregulation has exposed transmission planner to new objectives and uncertainties. Therefore, new criteria and approaches are needed for transmission planning in deregulated environments. In this paper we introduced a new method for computing the Locational ...

متن کامل

A stochastic mathematical program with complementary constraints for market-wide power generation and transmission expansion planning

Abstract—In the restructured electricity markets, the generators and the Independent System Operator (ISO) play important roles in the balance of electricity supply and demand. We consider a mixed integer bi-level model reformulated as a mathematical program with complementary constraints (MPCC) in which a single conceptual leader decides the transmission line expansion plan and generators plan...

متن کامل

A New Model Considering Uncertainties for Power Market

Medium-term modeling of electricity market has essential role in generation expansion planning. On the other hand, uncertainties strongly affect modeling and consequently, strategic analysis of generation firms in the medium term. Therefore, models considering these uncertainties are highly required. Among uncertain variables considered in the medium term generation planning, demand and hyd...

متن کامل

Considering Effect of Energy Market on Reactive Power Market

In this paper, a new structure for reactive power market is presented. Considering reactive power losses caused by active power flow in the reactive power market is the main purpose of this paper. Hence, this study tries to improve reactive power market and create fair competition in reactive power generation.

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Energies

سال: 2023

ISSN: ['1996-1073']

DOI: https://doi.org/10.3390/en16073256