A bi-objective genetic algorithm approach to risk mitigation in project scheduling
نویسندگان
چکیده
منابع مشابه
A HYBRID GENETIC ALGORITHM FOR A BI-OBJECTIVE SCHEDULING PROBLEM IN A FLEXIBLE MANUFACTURING CELL
This paper considers a bi-objective scheduling problem in a flexible manufacturing cell (FMC) which minimizes the maximum completion time (i.e., makespan) and maximum tardiness simultaneously. A new mathematical model is considered to reflect all aspect of the manufacturing cell. This type of scheduling problem is known to be NP-hard. To cope with the complexity of such a hard problem, a genet...
متن کاملProactive Project Scheduling with a Bi-Objective Genetic Algorithm in an R&D Department
During project execution, especially in a multi-project environment unforeseen events arise that disrupt project plans resulting in deviations of project plans and budgets due to missed due dates and deadlines, resource idleness, higher work-in-process inventory and increased system nervousness. Therefore, project schedules should also include solution robustness to cope with the uncertainties ...
متن کاملA genetic algorithm approach for open-pit mine production scheduling
In an Open-Pit Production Scheduling (OPPS) problem, the goal is to determine the mining sequence of an orebody as a block model. In this article, linear programing formulation is used to aim this goal. OPPS problem is known as an NP-hard problem, so an exact mathematical model cannot be applied to solve in the real state. Genetic Algorithm (GA) is a well-known member of evolutionary algorithms...
متن کاملA bi-objective algorithm for a reactive multi-skill project scheduling problem
The aim of this paper is to present project scheduling problem met in a an industrial context. The focus is mainly to the reactive model. In fact, the predictive case was studied in previous works, and this paper presents a solution for a reactive version of the model studied before. We proposed a linear mathematical model for the problem and then we show that this model cannot be used in pract...
متن کاملA Multi-objective Approach to the Software Project Scheduling Problem
The Software Project Scheduling (SPS) problem relates to the decision of who does what during a software project lifetime. This problem has a capital importance for software companies. In the SPS problem, the total budget and human resources involved in software development must be managed optimally in order to end up with a successful project. Companies are mainly concerned with reducing both ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Production Economics
سال: 2008
ISSN: 0925-5273
DOI: 10.1016/j.ijpe.2006.08.027