A BESPOKE APPROACH FOR RELATING MATERIAL WASTE TO COST OVERRUN IN THE CONSTRUCTION INDUSTRY
نویسندگان
چکیده
منابع مشابه
from linguistics to literature: a linguistic approach to the study of linguistic deviations in the turkish divan of shahriar
chapter i provides an overview of structural linguistics and touches upon the saussurean dichotomies with the final goal of exploring their relevance to the stylistic studies of literature. to provide evidence for the singificance of the study, chapter ii deals with the controversial issue of linguistics and literature, and presents opposing views which, at the same time, have been central to t...
15 صفحه اولa frame semantic approach to the study of translating cultural scripts in salingers franny and zooey
the frame semantic theory is a nascent approach in the area of translation studies which goes beyond the linguistic barriers and helps us to incorporate cognitive and cultural factors to the study of translation. based on rojos analytical model (2002b), which centered in the frames or knowledge structures activated in the text, the present research explores the various translation problems that...
15 صفحه اولa new approach to credibility premium for zero-inflated poisson models for panel data
هدف اصلی از این تحقیق به دست آوردن و مقایسه حق بیمه باورمندی در مدل های شمارشی گزارش نشده برای داده های طولی می باشد. در این تحقیق حق بیمه های پبش گویی بر اساس توابع ضرر مربع خطا و نمایی محاسبه شده و با هم مقایسه می شود. تمایل به گرفتن پاداش و جایزه یکی از دلایل مهم برای گزارش ندادن تصادفات می باشد و افراد برای استفاده از تخفیف اغلب از گزارش تصادفات با هزینه پائین خودداری می کنند، در این تحقیق ...
15 صفحه اولConstruction Waste Generation in the Iranian Building Industry
Building industry as one of the greatest industries in Iran comprises a significant share of waste generation in the country. Since a large quantity of the generated construction waste is buried due to the lack of a recycling protocol, it leads to an undesired waste of resources and causes severe environmental issues. This paper provides a study on the problem of material loss/construction wast...
متن کاملa synchronic and diachronic approach to the change route of address terms in the two recent centuries of persian language
terms of address as an important linguistics items provide valuable information about the interlocutors, their relationship and their circumstances. this study was done to investigate the change route of persian address terms in the two recent centuries including three historical periods of qajar, pahlavi and after the islamic revolution. data were extracted from a corpus consisting 24 novels w...
15 صفحه اولذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Construction Business and Management
سال: 2017
ISSN: 2521-0165
DOI: 10.15641/jcbm.1.1.63