“A Based-Bee Algorithm Approach for the Multi-Mode Project Scheduling Problem”
نویسندگان
چکیده
منابع مشابه
An Exact Algorithm for the Mode Identity Project Scheduling Problem
In this paper we consider the non-preemptive variant of a multi-mode resource constrained project scheduling problem (MRCPSP) with mode identity, in which a set of project activities is partitioned into disjoint subsets while all activities forming one subset have to be processed in the same mode. We present a depth-first branch and bound algorithm for the resource constrained project schedulin...
متن کاملThe Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem
This paper presents the formulation and solution of the Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem. The focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. The motivation for developing such an approach is due in part to practica...
متن کاملan exact algorithm for the mode identity project scheduling problem
in this paper we consider the non-preemptive variant of a multi-mode resource constrained project scheduling problem (mrcpsp) with mode identity, in which a set of project activities is partitioned into disjoint subsets while all activities forming one subset have to be processed in the same mode. we present a depth-first branch and bound algorithm for the resource constrained project schedulin...
متن کاملAn Evolutionary Algorithm Based on a Hybrid Multi-Attribute Decision Making Method for the Multi-Mode Multi-Skilled Resource-constrained Project Scheduling Problem
This paper addresses the multi-mode multi-skilled resource-constrained project scheduling problem. Activities of real world projects often require more than one skill to be accomplished. Besides, in many real-world situations, the resources are multi-skilled workforces. In presence of multi-skilled resources, it is required to determine the combination of workforces assigned to each activity. H...
متن کاملthe combinatorial multi-mode resource constrained multi-project scheduling problem
this paper presents the formulation and solution of the combinatorial multi-mode resource constrained multi-project scheduling problem. the focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. the motivation for developing such an approach is due in part to practica...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Procedia Manufacturing
سال: 2019
ISSN: 2351-9789
DOI: 10.1016/j.promfg.2020.01.252