13) Comment of Hotel Construction Plan

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Comment 9: Comment on Chapter 13

Under EMU,monetary policy is oriented towards union-wide economic conditions, and cannot effectively address country-specific macroeconomic disturbances. Should national fiscal policy be used more actively, for stabilizing individual economies, now that exchange rate changes among member countries are no longer possible? Several recent studies answer this important normative question, based on ...

متن کامل

Intuitive Plan Construction and Adaptive Plan Selection

Typical tasks of multi agent systems are effective coordination of single agents and their cooperation. Especially in dynamic environments, like the RoboCup soccer domain, the uncertainty of an opponent’s team behavior complicates coordinated team action. This paper presents a novel approach for intuitive multi agent plan construction and adaptive plan selection to attempt these tasks. We intro...

متن کامل

Construction of indoor floor plan and localization

Indoor positioning and tracking services are garnering more attention. Recently, several state-of-the-art localization techniques have been proposed that use radio maps or the sensors readily available on smartphones. This paper presents a localization system called Construction of indoor floor plan And LocaLization (CALL), which is based on a floor plan, access points (APs), and smartphone sen...

متن کامل

Localized Planning With Diversified Plan Construction Methods

This paper describes COLLAGE, a planner that utilizes a variety of non-traditional methods for plan construction within a partitioned or localized reasoning framework. The COLLAGE domain representation and plan construction methods are based on the use of action-based constraints. Not only do such constraints yield highly natural domain encodings, but they are also associated with cost-effectiv...

متن کامل

Backward Plan Construction under Partial Observability

We present algorithms for partially observable planning that iteratively compute belief states with an increasing distance to the goal states. The algorithms handle nondeterministic operators, but restrict to problem instances with a finite upper bound on execution length, that is plans without loops. We discuss an implementation of the algorithms which uses binary decision diagrams for represe...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Transactions of the Architectural Institute of Japan

سال: 1949

ISSN: 0387-1177,2433-0019

DOI: 10.3130/aijsaxxx.39.0_98